My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - The Troyer Group - 2018 Flood Damage Assessment and Repairs
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - The Troyer Group - 2018 Flood Damage Assessment and Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:51:33 AM
Creation date
7/11/2018 12:05:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 12 pages, referred to in <br />and part of the Agi•eernent between Owner and Engineer <br />for Professional Services dated July 10, 2018, <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agrcement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1— BASIC SERVICES <br />DELFTED <br />A, Engineer shall: <br />1. Consult with Owner to define and clarify Owner's requirements for the Project and <br />available data. <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer's Basic Services. <br />Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental assessment. <br />4. Identify and evaluate [insert Wecifrc number- or list here] alternate solutions available to <br />Owner and, after consultation with Owner, recommend to Owner those solutions which in <br />Engineer's judgment meet Owner's requirements for the Project. <br />Prepare a report (the "Report") which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed -to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, <br />and related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />[here list any sireh tasks or deliverables] <br />7, Furnish T review copies of the Report and any other deliverables to Owner within _ <br />calendar days of the Effective Date and review it with Owner. Within _ calendar days of <br />receipt, Owner shall submit to Engineer any comments regarding the Report and any other <br />deliverables, <br />Page r <br />(Exhibit A— Engineer's Services) <br />EJCDC E-500 Agreement Between Owner anti Engineer for Professional services <br />Copyright CC) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.