Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Ravina Park — Bowman Creek Stabilization <br />Project No. 117.073A <br />For Bids Due July 10t', 2018 <br />I No. I Description I Quantity I Unit I Unit Price I Amount I <br />. BANK STABILIZATION AND PARK CONSTRUCTION <br />I <br />CONSTRUCTION ENGINEERING <br />I <br />LS_ <br />00 <br />60 <br />2 <br />CLEARING AND GRUBBING <br />4500 <br />SFT <br />15 <br />0 <br />3 <br />TREE REMOVAL, SMALLER 10" DIA <br />5 <br />EACH <br />5�n <br />1600 <br />4 <br />TREE REMOVAL, LARGER 10" DIA <br />2 <br />EACH <br />2.Z.5C> <br />415-06 <br />5 <br />BRIDGE REMOVAL <br />1 <br />LS <br />6-766 <br />62M <br />6 <br />EXCAVATION, CHANNEL CUTTING/SHAPING <br />80 <br />CYD <br />7 <br />TEMPORARY EROSION CONTROL <br />I <br />LS_ <br />%741 <br />8 <br />BURRITO EROSION CONTROL MAT <br />(SCI 5013N). <br />2200 <br />SFT <br />j - —V'O <br />9 <br />BURRITO INFILL MATERIAL <br />BLENDED MI <br />50 <br />CYD <br />zyApq' 80 <br />10 <br />EROSION CNTRL VEGETATED LOG <br />(CARDNO) <br />LFT <br />49R 73 <br />to <br />I I <br />LOG VANE <br />2 <br />EACH <br />Mco 75 <br />/5 3 <br />12 <br />TOE WOOD STRUCTURE FOUNDATION LOGS <br />245 <br />LFT <br />0 75- <br />(077 &00,qO <br />13 <br />BANK FILL MATERIAL (LIMBS, ETC.) <br />40 <br />CYD <br />� <br />14 <br />EROSION CONTROL MAT (GEOWEB) <br />2900 <br />SFT <br />7 Z? (o cc> <br />— <br />15 <br />LIVE STAKES ( I'O.C., INSTALLED <br />DORMANT,) <br />2880 <br />EACH <br />Z <br />1.6 sz:/. (00 <br />16 <br />OVERSTORY TREE, 2" CALIPER <br />10 <br />EACH <br />G* 7 IS" <br />17 <br />FIELD STONE (STREAM RIFFLES) <br />10 <br />CYD <br />118 <br />AJACKS ARMORMENT <br />18 <br />CYD <br />9 <br />119 <br />GRAVEL LEVELING SUBBASE (FOR AJACKS) <br />40 <br />CYD <br />20 <br />WETLAND BURRITO WRAP (TMAX) <br />1500 <br />SFT <br />s- <br />20 <br />20 <br />LIVE PLUGS <br />600 <br />4 1Z <br />Version 10/1712017 Contractor's Bid for Public Works - 1 <br />