Laserfiche WebLink
PART II - SECTION 11- PLAN AND EQUIPMENT QUESTIONAIRE <br />1. PLAN FOR PERFORMING PROPOSED WORK: <br />• Perform layout and engineering work; <br />• Obtain soils samples and report(s); <br />• Kill vegetation in area of proposed work (TruGreen); <br />• Bridge removal; <br />• Clear and grub site; <br />• Perform excavation work; <br />• Install improvements as per the plan (Toewood, Burritos, Ajacks, Log Vanes, Stream Riffles); <br />• Install near sidewalk; <br />• Place topsoil as needed; <br />• Install erosion mat, live plugs, grass seed. <br />2. LIST OF SUBCONTRACTORS ON PUBLIC JOBS FOR THE PAST 5 YEARS: <br />• Action Glass Co. - window replacement <br />• Anthony Irrigation, - irrigation system installation <br />• Arnt Asphalt Sealing Inc. - asphalt installation <br />• Bertsch -Frank & Associates LLC - land surveying <br />• C & S Masonry Restoration LLC - granite restoration <br />• Cabbit Concrete LLC - concrete installation <br />• Cardno Inc. - supplier of specialty seed/plants, specialty installation of seed on specific jobs, <br />consulting services. <br />• H & G Services - electrical installation <br />• JEM Concrete Drilling & Sawing Inc. - granite/concrete sawing and drilling <br />• Kachur Tree Service LLC - tree removal <br />• Mike's Fencing - fence installation <br />• Miramontes Tree Service -tree removal <br />• Premium Concrete Services - concrete installation <br />• Reith-Riley Construction Co., Inc. - sidewalk installation <br />• Scotty's Ventures - mechanical work, removal of fountain pump at IUSB <br />• Trugreen - weed/vegetation control and eradication <br />• Walsh & Kelly, Inc. - sidewalk installation <br />• Wissco Irrigation Inc. - irrigation system installation <br />