My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Off Street Parking Lot at Wayne St and St Louis Blvd Proj No 117-083B - Rieth Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Off Street Parking Lot at Wayne St and St Louis Blvd Proj No 117-083B - Rieth Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:47:18 PM
Creation date
7/11/2018 11:10:22 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA ("it,, TMM <br />11, <br />CONTRACTOR'S BID FOR PUBLIC'S ORK w-M <br />1865, <br />CHECKLIST FOR BIDDERS <br />Project Name OffsIte Parking Lot at Wayne St. and St. Louis Boulevard <br />Project No. 117-083B <br />For Bids Due July 10, 2018 <br />From time to time the South Bend Board of Public'Works finds it necessary to reject a bid because <br />it does not comply with statutory requirements. In preparing your bid, please use the following <br />checklist in order to make sure that your bid is done in the proper manner. <br />Proper bid security included. The bidder has the option of providing either a Certified Check <br />X or Bid Bond, <br />Bid prepared on the City of South Bend Contractors Bid for Public Work Form, completely <br />X executed. <br />Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments <br />with Iran, Employment Eligibility Verification, Non-Discriminalion Commitment, and <br />X Certification of use of United States Steel Products or Foundry Products. <br />Proof of IMBEMBE Participation Goal Form, [MWBE-1.0). If minimum participation goal is not <br />met, also provide Evidence of Good! Faith Efforts Form [MWBE-2.0] and MBE)WBE Contacted <br />X Form JMWBE-2.11. <br />X Acknowledge Receipt of #1 Addendum(s) included with the bid. <br />X Ail required additional information is included with the bid. <br />Proposal statements and other affidavits all signed by the proper party with name either <br />X printed or typed underneath signature. <br />X This checklist submitted with the Bid. <br />This checklist Is provided for bidder's use In assuring compliance with required <br />documentations; however, it does not Include all specifications requirements and does not <br />relieve the bidder of the need to read and comply with, the specifications. <br />Bidder: Rieth-Riley Construction Co., Inc. Date: July 10, 2018 <br />By Authorized R <br />Signature: <br />Print Name & Ti, <br />Version 10/17/2016 Contractor's Bid for Public Works - I <br />
The URL can be used to link to this page
Your browser does not support the video tag.