My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Beam Longest and Neff LLC - Design of Pedestrian Bridge for Leeper Park Improvement Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Beam Longest and Neff LLC - Design of Pedestrian Bridge for Leeper Park Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:13:13 AM
Creation date
6/27/2018 8:35:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: E657424D-142C-4DDA-85F9-31D697BE4B70 <br />environmental research will be performed for the Technical Memoand no hydraulics on <br />the boardwalk will be performed. A preliminary construction cost estimate will be <br />provided based on the assumption that the City of South Bend's Q100 boardwalk <br />serviceability is hydraulically feasible. The geometry for the boardwalk will be based on <br />the information provided to the Owner as a part of the permit meeting on April 27, 2018. <br />7. Furnish 3 review copies of the Report and any other deliverables to Owner within 45 <br />calendar days of the Effective Date and review it with Owner. Within 14 calendar days of <br />receipt, Owner shall submit to Engineer any comments regarding the Report and any other <br />deliverables. <br />S. Revise the Report and any other deliverables in response to Owner's comments, as <br />appropriate, and furnish 3 copies of the revised Report and any other deliverables to the <br />Owner within 21 calendar days of receipt of Owner's comments. <br />B. Engineer's services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />a <br />• <br />■ <br />• <br />■ •TOM <br />w � <br />• <br />■ <br />w <br />Page 2 <br />(Exhibit A — Engineer's services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.