Laserfiche WebLink
Ameritech orive Pavement fmmoveme0ts <br />Protect No. 111-057A <br />Bid Tab <br />June 12, 2018 <br />Ameritech Drive Pavement improvements <br />City Project No. 117-067A <br />City of South Bend <br />131d Tabulation <br />Base Bid <br />Engineer's Estimate <br />Walsh & Kelly, Inc. <br />I Rleth-R€€ey Constr. Co. Inc <br />Item <br />No. <br />Doseripttan <br />&antlty <br />Unit <br />Unit Price <br />I Amount <br />Unit Pdco <br />Amount <br />Unit Price <br />Amount <br />1. <br />Go Stru6orr Engirleedru <br />1 <br />LS <br />1.5% <br />$5,294.10 <br />$3,700.00 <br />$3.700.00 <br />$1,000.00 <br />S4,000.00 <br />2. <br />MotaBsakor,r0emabilizatfnn <br />1 <br />LS <br />5.0% <br />$17,647.90 <br />S'18,500.00 <br />51a,600.00 <br />$3,000.00 <br />$3,000.00 <br />3. <br />Claming Righl of Way <br />1 <br />LS <br />'siipw00 <br />$5,00.00 <br />S8.450.00 <br />48,450.00 <br />$7,600.00 <br />$7,600.Oo <br />4. <br />Sheal 819n, Remove aW Relocate <br />3 <br />EACH <br />$seo.n0 <br />$900.00 <br />$400.00 <br />$1.2uu 9n <br />$30o.0o <br />$900.00 <br />5. <br />Fire Hydrant Assembly, Remove and Relocate <br />1 <br />EACH <br />$600.00 <br />$600A0 <br />S5.2w 00 <br />$5.200.00 <br />$2,300.00 <br />$2,3W 00 <br />6, <br />Gamete Curb and Gutter. Remove <br />020 <br />LFT <br />$9.uo <br />$7,380.00 <br />$5.30 <br />$4.346.00 <br />$14.00 <br />$11,480.00 <br />7. <br />Comets Approaches, Remove <br />240 <br />sY0 <br />$1eilo <br />$2,400.00 <br />$11.00 <br />$2,640.00 <br />$37.00 <br />$8,880.00 <br />a <br />1comMon Excavation <br />2,370 <br />CYO <br />$20.00 <br />$47,400.00 <br />$24.00 <br />558,880.00 <br />$28.00 <br />$86,360.00 <br />9. <br />B'Borroa <br />1,490 <br />CYOr$25.00 <br />$26,820.00 <br />330.80 <br />$45,892.00 <br />$3400 <br />$50,860.00 <br />10. <br />Milling, Asphalt Variable Depth <br />4,000 <br />SYD <br />$8,120,00 <br />$3.00 <br />$12,180.00 <br />$3,50 <br />$14,210.00 <br />11. <br />HMA for PatchiN(undistributed) <br />340 <br />TON <br />$34.000.00 <br />$50.00 <br />519,72o-W <br />$135.00 <br />$454900.00 <br />12. <br />Compacted Aggregate ff Base, Na. 53 <br />630 <br />TON <br />$15,750.00 <br />$4000 <br />$25,200.00 <br />$3300 <br />$20,790A0 <br />13. <br />HMA SvAace, 9.6 mm, Type U <br />480 <br />TON <br />M.800.00 <br />$0200 <br />$39,360.00 <br />$97.00 <br />$46.%0.00 <br />14. <br />HMA Intermediate,#9.0 mm. TypeB <br />170 <br />TON <br />$13,260.00 <br />$78.00 <br />$13,200.00 <br />$130.00 <br />$22,100,00 <br />15. <br />AMA Base, 25A MR Type O <br />670 <br />TON <br />$70.00 <br />$46,900.00 <br />$58.00 <br />$38,660.00 <br />$84.00 <br />$58,280A0 <br />18, <br />Calmat. Curb and Ginter, 6. <br />820 <br />LFT <br />$26.00 <br />$20,500.00 <br />$29.00 <br />$23.780.00 <br />$27.00 <br />422,140,00 <br />17, <br />PCCP for Approaches, 8' <br />60 <br />5YO <br />$6500 <br />$3,W0.00 <br />$7200 <br />$4.920.00 <br />$65.00 <br />$3,900.0o <br />W <br />PCCP for Approaches. 9' <br />320 <br />5Y0 <br />$75.00 <br />$24,000.00 <br />$79.50 <br />$25,440.00 <br />583.00 <br />$20,16ano <br />19. <br />Mulched $mdinu, Type U <br />660 <br />SYO <br />$1.50 <br />$1,290.00 <br />$6.67 <br />$5,736.20 <br />$6,28 <br />$5,400,80 <br />20, <br />MaInIoWng Traffic <br />1 <br />LS <br />$30,000.00 <br />$30,000.00 <br />$15,474.80 <br />$15.414.60 <br />$8,000.00 <br />$6,000.00 <br />21, <br />Jne, Therm Pastic, Yellow, 4' <br />614 <br />LFT <br />$1.00 <br />$518.00 <br />32A0 <br />$1,03ana <br />$1.45 <br />$751.10 <br />22, <br />Jne, Thaw oastic, While, 4' <br />230 <br />LFT <br />$1.00 <br />$230,00 <br />$2.00 <br />$460.00 <br />$1.45 <br />$333.60 <br />23, <br />ransverse Uns, Thermoplastic, White, 24", Stop Bar <br />40 <br />LFT <br />$6.00 <br />$240,00 <br />$10 00 <br />$400.00 <br />$5.95 <br />$238.00 <br />24- <br />Pavement Message Mwkirug, Ther nopla Uc, Lorne Ind!-V. <br />2 <br />EACH <br />$350.00 <br />$700.00 <br />$250,00 <br />$500.00 <br />S80.00 <br />516Uc0 <br />26. <br />iAMA fnr Temporary Pavement <br />445 <br />5YU <br />$50.00 <br />$22.250.00 <br />L $37,00 <br />S55,465.00 <br />534.00 <br />$16,130.00 <br />Total - Base Bid <br />$375,900.00 <br />$389,000.00 <br />$437.133.40 <br />,. A RAlll .....r Anc„Hann rJnrlh n(nrpvalanH Rnad <br />Engineers Estimate Walsh & Kelly, Inc. <br />Rlettl-R€ley Constr. Co. Inc <br />E <br />Oescript€on 4auanury Unit <br />Unit Pr€co <br />Amours! Unit Pdce <br />Al <br />Milling, AsphalL Vadable Oepth 8,650 sYp <br />$2.00 <br />$17,21M00 $3.80 1 <br />$31,140,00 <br />$1.651 <br />S14,272.50 <br />A2. <br />AMA Surface, 9.5 mm, Type 11 750 TON <br />$95,00 <br />$63,75000 $79.011 1 <br />$59,25ario <br />$95.00 <br />571,250.00 <br />A3. <br />AMA for Patchhg(UAdfSlribuled) 710 TON <br />$100.00 <br />$71,0W.00 $56-00 1 <br />$41,180.00 <br />$129.co <br />$91,690.00 <br />Total - AlternateA <br />$152.050.00 $131,570.00 <br />$177,112,50 <br />Englneers Estimate <br />Walsh & Kelly, Inc. I Rfeth•Rlley Conste. Co. Inc <br />Total Base Bid <br />$375,900.00 <br />$369 o0G.00 $437,133.40 <br />total Base B€d +AlternateA <br />$527,950.00 <br />$520.570.00 $614,245.90 <br />Addendum 41 Acknowledged A - stttt <br />I hereby certify that the above truly and accurately{�!t! <br />represents bids received for this project on June 12, 2018 A <br />K0.�os�otoz <br />�jl." � ar. 14 / 1 � � �� ■ <br />Chad A. e <br />Abonmarthche Consultants, Inc. <br />Yes Yes <br />loft <br />