Laserfiche WebLink
Vlll. Revise Table in Item A.1. of Section C2.01 of Exhibit C as follows: <br />Item I <br />Description <br />Amount <br />Type <br />Design Services: <br />a. <br />Topographic Survey <br />$18,900.00 <br />LumpSum <br />b. <br />Study and Report Phase <br />$7,500A0 <br />Lump <br />Sum <br />C. <br />12-Hour Traffic Counts <br />$2,400.00 <br />Lump <br />Sum <br />d. <br />Design and Plans for the Two -Way Conversion of Colfax Avenue Including: <br />i) <br />Two -Way Conversion of W. Lasalle Avenue, Realignment of W. Lasalle <br />$6,900.00 <br />Lump <br />Avenue, and Visitor Parking Lot <br />Sum <br />ii) <br />Two -Way Conversion of Colfax Avenue <br />$3,900.00 <br />Lump <br />Sum <br />iii) <br />Street Improvements along Elm Street <br />$6,900.00 <br />LumpSum <br />iv) <br />Redesign of West ColfaxAlleyApproach <br />2'400.00 <br />Cutup Sum <br />e. <br />Building Demolition (as directed by Owner) <br />$5,700.00 <br />LumpSum <br />Using Owner's Template, Prepare up to One (1) Separate Quote Package <br />$2,000.00 <br />Lump <br />f <br />for Building Demolition, if Required <br />Sum <br />Design and Plans for Intersection Improvements at Colfax Avenue with <br />$8,000.00 <br />Lump <br />9- <br />Studebaker Street <br />Sum <br />h. <br />Landscape Design and Plans (Subconsultant) <br />$36,100.00 <br />LumpSum <br />L <br />Utility Coordination <br />$4,900.00 <br />LumpSum <br />Lighting Design - Elm Street, from Washington Street to and Including the <br />,.00 <br />$6500 <br />Lump <br />Intersection of Colfax Avenue with Elm Street, and the Visitor Parking Lot <br />Sum <br />k. <br />Installation of Stop Signs and Sidewalk Repair <br />$2,000.00 <br />LumpSum <br />I. <br />Public Information Meeting (up to 3 @ $2,800,00) <br />$8,400.00 <br />LumpSum <br />M. <br />Bidding, Preconstruction, and Construction Phase <br />$4,500.00 <br />Hourly <br />Conceptual Intersection Improvement Plan for Intersection of Colfax <br />$4,600.00 <br />Lump <br />n' <br />Avenue and LaPorte Avenue <br />Sum <br />Design and Plan for Intersection Improvement at Intersection of Colfax <br />$10,400.00 <br />Lump <br />°' <br />Avenue and LaPorte Avenue <br />Sum <br />P. <br />LaSalle Alignment Study <br />$3,100.00 <br />Lump <br />Sum <br />q. <br />Preparation of Conceptual Alignments for West Colfax Alley Approach <br />$4,000.00 <br />Lump <br />sum <br />Repackage the Colfax/Studebaker Intersection Design from the 2018 to the <br />$4,900.00 <br />Lump <br />r <br />2019 Project <br />sum <br />Total Design services: <br />$154,000.00 <br />3of5 <br />Supplemental Agreement No. 2 <br />