My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lochmueller Group Inc - Leeper Park Improvement Project
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lochmueller Group Inc - Leeper Park Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:43:40 AM
Creation date
6/19/2018 2:18:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT A, consisting of 18 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , <br />Engineer's Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below based on the following project <br />understanding: <br />Project UnderstandinI4 <br />Project Area: Leeper Park bounded by the park's property line on the west, the St. Joseph River on the north and east, <br />and Bartlett Street on the south• Task 1 of the Historic Leeper Park Improvements project is a scoping study to fir •they <br />define and assign opinions of probable construction cost to improvement projects defined in the South Bend River li ont <br />Parks & Trails Conceptual Framework. These projects include: <br />1. Connection Trail <br />This specifically relates to a new trail on the west side of the park continuing from a trail on the south edge of <br />the existing ballfield and connecting to Riverside Drive on the west side ofthe tennis courts. For the purposes <br />of this scoping study, Lochmueller Group will look at internal connectivity throughout Leeper Park including <br />a trail connection along the cast side of Riverside Drive, along the river to Marion Street. <br />2. Multipurpose Feld <br />Conversion of the existing baseball/softball field into a multipurpose sports field. <br />3. Play Area <br />Lochmueller Group will develop a concept for the creation of a new playground located south of the existing <br />tennis courts. <br />4. Overlook Plazas (2) <br />Lochmueller Group will develop concepts for two (2) liver viewing plazas - one north of Riverside Drive and <br />aligned with Lafayette Boulevard and one in the east section of the park near the Rose Garden. <br />5. Studebaker Fountain and Plaza <br />Lochmueller Group will develop a concept for siting the fountain, the associated plaza design, and <br />utility/fountain infrastructure. <br />6. Lavender Garden <br />A concept will be developed illustrating proposed improvements and additional elements in the existing <br />lavender garden, <br />7. Amphitheater <br />Lochmueller Group will complete an inventory and analysis of the existing amphitheater and will make <br />recommendations for improvements. <br />8. Display Gardens <br />Page 1 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.