Laserfiche WebLink
This is EXHIBIT C, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated May 22, 2018. <br />Payments to Engineer for Services and Reimbursable Expenses <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A at a Standard Hourly Rates <br />Method of Payment not to exceed (HNTE). The total shall not exceed $50,000.00 unless an <br />amendment is executed which increases the maximum amount payable. <br />B. Compensation: <br />1. An amount of $50,000 HNTE budget is requested for the Primary Work Elements noted in <br />the above appendices. This assumes one (1) week for a survey crew and two (2) days for a <br />confined space entry crew to perform field survey and inspections. The fee also includes <br />estimated hours for all other tasks noted in Exhibit A. <br />C2.02 Compensation for Lump Simi Method of Payment (LSUM <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A as described and identified in <br />Paragraph C2.01 with compensation as LSUM as follows: <br />Engineer may alter the distribution of compensation between individual project phases or other <br />identified work noted herein to be consistent with services actually rendered, but shall not <br />exceed the total Lump Sum amount unless approved in writing by the Owner. <br />2. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account <br />for labor, overhead, profit, and Reimbursable Expenses. <br />3. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the billing <br />period. <br />B. Period of Service: The compensation arnount stipulated in Compensation is conditioned on a period <br />of service not exceeding 9 months exclusive of Construction Phase. If such period of service is <br />extended, the compensation amount for Engineer's services shall be appropriately adjusted. <br />Page 1 <br />Exhibit C --Basic Services (other than RPR and Post -Construction) — Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Sea -vices. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />