My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Abonmarche Consultants Inc - Rehab of Ameritech Lift Station
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Abonmarche Consultants Inc - Rehab of Ameritech Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:05:08 AM
Creation date
6/19/2018 2:02:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10. Change Orders and Work Change Directives: DELETED <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in <br />respect to Shop Drawings and Samples and other data which Contractor is required to <br />submit, but only for conformance with the information given in the Contract Documents <br />and compatibility with the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. Such reviews and approvals or other action will <br />not extend to means, methods, techniques, sequences, or procedures of construction or to <br />safety precautions and programs incident thereto. Engineer shall meet any Contractor's <br />submittal schedule that Engineer has accepted. <br />12. Substitutes and "or -equal": Evaluate and determine the acceptability of substitute or "or - <br />equal" materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13, Inspections and Tests: DELETED <br />14. Disagreements between Owner and Contractor: DELETED <br />15. Applications for Payment: DELETED <br />16. Contractor's Completion Documents: DELETED <br />17. Substantial Completion: DELETED <br />18. Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: Prepare Record Drawings to incorporate As -Built and final conditions <br />once upgrades are completed by the Contractor. <br />19. Final Notice ofA cceptab ility of the Work: DELETED <br />B. Duration of Construction Phase: The Construction Phase will commence with the execution of the <br />first Construction Contract for the Project or any part thereof and will terminate upon written <br />recommendation by Engineer for final payment to Contractors. If the Project involves more than <br />one prime contract as indicated in Paragraph A1.03.C, then Construction Phase services may be <br />rendered at different times in respect to the separate contracts. Subject to the provisions of Article <br />3, Engineer shall be entitled to an equitable increase in compensation if Construction Phase services <br />(including Resident Project Representative services, if any) are required after the original date for <br />completion and readiness for final payment of Contractor as set forth in the Construction Contract. <br />C. Limitation of Responsibilities: Engineer shall not be responsible for the acts or omissions of any <br />Contractor, Subcontractor or Supplier, or other individuals or entities performing or furnishing any <br />of the Work, for safety or security at the Site, or for safety precautions and programs incident to <br />Contractor's Work, during the Construction Phase or otherwise. Engineer shall not be responsible <br />Page 4 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />