My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - FLIR Traffic Camera Replacements Proj No 118-006 - Pemberton Davis Electric
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 1 - FLIR Traffic Camera Replacements Proj No 118-006 - Pemberton Davis Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:36:26 PM
Creation date
6/19/2018 1:12:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/12/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />DEPARTMENT OF PUBLIC WORKS <br />PROJECT CHANGE ORDER <br />DATE: 5/26/2018 <br />PROJECT NO: 118-006 <br />PROJECT NAME: <br />CONTRACT DATE: <br />CHANGE ORDER NO: <br />SUBJECT OF CHANGE ORDER: <br />FUR Traffic Camera Replacements <br />2/13/2018 <br />I <br />PCR #1-5 Amp Power Supply,Rack, & SDLC Cable, PCR #2- <br />Span/Cant/Tether & Remove/Replace Signs Disconnect PCR #3- <br />Signal Head Remove and _Replace <br />The original contract sum <br />Net change by previously authorized change orders <br />The contract sum prior to thiis change order <br />By this Change Order, the project amount is <br />The new contract sum including this change order <br />This Change Order represents a total change of <br />Total change for entire project <br />Original contracted completion date/time <br />Extension of date/time by previous change orders <br />Date/time extension by this change order <br />New completion date/time <br />CON -TRACTOR <br />ContrAtor Sig attire <br />LV <br />Printed Name and Title <br />Pemberton Davis Electric, Inc. <br />Company Name <br />916 E. McK inle Ave. <br />Address <br />Mishawaka:, IN 46545 <br />City, State, Zip <br />FX] Increased <br />[] Decreased <br />.6/20/20118 <br />0-days <br />0 days <br />6/20/2018 <br />110,110.10 <br />0.00 <br />110,110.110 <br />$ 13,756,00 <br />$ 123,86610 <br />12-49 % <br />12.491 % <br />I 11i'll "," <br />CONSTR�U ,rION MANAGER <br />NMAEWi�LW <br />NUAM <br />Gary A. Gilot, President <br />Suzanna M. Fritzberg, Member <br />C uLL <br />Elizabeth A. Maradilk, Member <br />Therese J. Qlbrau, M—ember <br />James A. Mueller, Member <br />
The URL can be used to link to this page
Your browser does not support the video tag.