My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 19 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 19 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:44:53 PM
Creation date
5/23/2018 3:06:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />WWTP SECONDARY TREATMENT IMPROVEMENTS <br />CITY PROJECT NO. 114-053 <br />CHANGE ORDER PROPOSAL <br />Change Order• Proposal No.: 1 14-053-1 18R 1 Date: 05/08/18 <br />Submitted in Response to Proposal Request No.: <br />('ontract Name and No.: 1 14-053 South Bend WWTP Secondary Treatment Im provemettts <br />Contractor: Thieneman Construction Inc_ <br />Subject: Credit for Unacceptable Concrete 1=inish Work oil Deck <br />The following changes to the Contract are proposed: <br />SCOPE OF WORK: (auach and Hsi supporfh g iglooaalion as required) <br />TO acknowledges that the North end or the aeriation deck concrete finish is not to acceptable <br />quality standards. However, it is struCturally sound. As an alternative to complete removal or <br />surface seat -if cation and patching, TC1 is offering minor repairs and a lump sum credit. The amount <br />of the one-time lump sum deduct to the final contract value of $22,000.00. The minor repairs are <br />limited to: <br />+ Encapsulate pipe support in grout to avoid water ponding <br />• Patch edge of joints prior to caulking (approximately 30 It) <br />• Minor grinding of concrete slobbers primarily under pipe <br />• Minor patching around Norlliern access hatch to ramp up height difference (10 If x 3") <br />+ Minor patching or exposed aggregate tinder pipe <br />Expansion joints will be sealed per plan <br />The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it <br />is entitled as a result of the proposed change. <br />Change Order Proposal By: Matt McCoy <br />Signature of Proposer:h,c.— <br />
The URL can be used to link to this page
Your browser does not support the video tag.