WATITRIO MS.
<br />Category Description
<br />Environmental Document Preparation
<br />5.2 Categorical Exclusion Level 2
<br />Topographic Survey
<br />6.1 Topographic Survey (LFA)
<br />Topographic Survey (VS Eng)
<br />ME Reports (37 Tax IDs at $450/Ea),
<br />ME Updates (23 Tax IDs at $250/Ea)
<br />Subtotal:
<br />8.1 Road Design and Plan Development
<br />Lighting Design
<br />Project Design Development
<br />Pre -construction Conference
<br />Subtotal:
<br />Utility Coordination
<br />Geotechnical Services (EEI)
<br />Design Hearing/Public Involvement
<br />11.1 R/W Plan Development
<br />R/W Engineering (Est. 29x$2,700/Ea)
<br />R/W Engineering Undistributed (10%)
<br />R/W Staking (29 x $650/Ea)
<br />R/W Staking Undistributed (10%)
<br />Type
<br />LSUM
<br />LSUM
<br />17,900,00
<br />LSUM
<br />10,400.00
<br />EACH
<br />EACH
<br />28,300,.00
<br />LSU M 152,200.00
<br />LSU M 1,000.00
<br />153,200.00
<br />. ok
<br />EACH
<br />EACH
<br />12 Real Estate Services
<br />APA, Appraisal, Review, Buying, Closing EACH
<br />R/W Management EACH
<br />Construction Phase Services
<br />SBN - Olive Street Road Reconstruction
<br />Des, No. 1400637
<br />Updated 26Mar18
<br />Original Supp. Supp. Total
<br />Amount No. 1 No, 2 Amount
<br />$ 9,800.00 $ 8,700.00
<br />28,300.00
<br />$ 3,000m
<br />7,0010.00
<br />16,650M
<br />5,750.00
<br />32,400.00
<br />153,200.00 106,850.00
<br />5,000.00
<br />13,700.00
<br />wyrr wr
<br />$ 78,300.00
<br />7,900.00
<br />18,850M
<br />1,900.00
<br />$ 106,950.00
<br />$ 18,500.00
<br />$ 60,700.00
<br />$ 260,050-00
<br />61KEIXIIIJ
<br />199,000.00
<br />$ 159,100.00
<br />39,900.00
<br />5,000.00 5,,000.00
<br />Total Project Fee: 210,000.00 271,000.00 $ 199,000.00 $ 680,000.00
<br />VS Engineering, Inc. $ 10,400,00 $ 100,450.00
<br />DBE Percentage 4.95% 14.77%
<br />Net LFA Contract Amount = $ 185,900.00 $ 579,550.00
<br />UiSPr\9031 13 -SOUTH BENI) -OLIVE STREET - SUpPLEMENTAL NO. 2\TRAMSFER\JCantnct Amots - I9032GxkxJS1t1
<br />
|