Laserfiche WebLink
WATITRIO MS. <br />Category Description <br />Environmental Document Preparation <br />5.2 Categorical Exclusion Level 2 <br />Topographic Survey <br />6.1 Topographic Survey (LFA) <br />Topographic Survey (VS Eng) <br />ME Reports (37 Tax IDs at $450/Ea), <br />ME Updates (23 Tax IDs at $250/Ea) <br />Subtotal: <br />8.1 Road Design and Plan Development <br />Lighting Design <br />Project Design Development <br />Pre -construction Conference <br />Subtotal: <br />Utility Coordination <br />Geotechnical Services (EEI) <br />Design Hearing/Public Involvement <br />11.1 R/W Plan Development <br />R/W Engineering (Est. 29x$2,700/Ea) <br />R/W Engineering Undistributed (10%) <br />R/W Staking (29 x $650/Ea) <br />R/W Staking Undistributed (10%) <br />Type <br />LSUM <br />LSUM <br />17,900,00 <br />LSUM <br />10,400.00 <br />EACH <br />EACH <br />28,300,.00 <br />LSU M 152,200.00 <br />LSU M 1,000.00 <br />153,200.00 <br />. ok <br />EACH <br />EACH <br />12 Real Estate Services <br />APA, Appraisal, Review, Buying, Closing EACH <br />R/W Management EACH <br />Construction Phase Services <br />SBN - Olive Street Road Reconstruction <br />Des, No. 1400637 <br />Updated 26Mar18 <br />Original Supp. Supp. Total <br />Amount No. 1 No, 2 Amount <br />$ 9,800.00 $ 8,700.00 <br />28,300.00 <br />$ 3,000m <br />7,0010.00 <br />16,650M <br />5,750.00 <br />32,400.00 <br />153,200.00 106,850.00 <br />5,000.00 <br />13,700.00 <br />wyrr wr <br />$ 78,300.00 <br />7,900.00 <br />18,850M <br />1,900.00 <br />$ 106,950.00 <br />$ 18,500.00 <br />$ 60,700.00 <br />$ 260,050-00 <br />61KEIXIIIJ <br />199,000.00 <br />$ 159,100.00 <br />39,900.00 <br />5,000.00 5,,000.00 <br />Total Project Fee: 210,000.00 271,000.00 $ 199,000.00 $ 680,000.00 <br />VS Engineering, Inc. $ 10,400,00 $ 100,450.00 <br />DBE Percentage 4.95% 14.77% <br />Net LFA Contract Amount = $ 185,900.00 $ 579,550.00 <br />UiSPr­\9031 13 -SOUTH BENI) -OLIVE STREET - SUpPLEMENTAL NO. 2\TRAMSFER\JCantnct Amo­ts - I9032GxkxJS1­t1 <br />