Laserfiche WebLink
Installation List <br />Page 3 of 6 <br />CUSTOMER EQUIPMENT TYISIZE DATE <br />Scope: Complete site rebuild. Work consisted of new roller assemblies, fiberglass cylinders, new <br />electrical system, recondition washtubes, new washboxes, new drain pans, new dual shaft mount <br />gearmotors, all new wear parts, tension yoke bearings, retrofit hydraulic lid assembly, new filter <br />belts and panel upgrades. All site labor performed by Alfa Laval personnel. <br />Altamonte Springs WWTP Klampress (1) Size 3 2016 <br />950 Keller Road <br />Altamonte Springs, FL 32714 <br />Andrew Lobban <br />407-571-8634 <br />Scope: Complete site rebuild. Work consisted of new roller assemblies, new stainless steel drainage <br />parrs, new fiberglass cylinders, new electrical system, new stainless steel washboxes, new <br />washtubes, new drive gears and new filter belts. All site labor performed by Alfa Laval personnel. <br />Hot Springs WWTP Klampress (1) Size 3 2016 <br />320 Davidson Drive <br />Hot Springs, AR 71901 <br />Gordon Yates <br />501-262-1882 <br />Scope: Complete site rebuild. Work consisted of new roller assemblies, new fiberglass cylinders, <br />new electrical system, new wear parts, new stainless steel washboxes, new washtubes, new drive <br />gears and new filter belts. All site labor performed by Alfa Laval personnel. <br />New Shoreham WWTP Klampress (1) Size 1 2014 <br />1 Spring Street <br />Block Island, RI 02807 <br />Ray Boucher <br />401-466-3231 <br />Scope: Complete site rebuild. Work consisted of new roller assemblies, new stainless steel drainage <br />pans, new fiberglass cylinders, new electrical system, new stainless steel washboxes, new <br />washtubes, new gravity drainage grids, new drive gears, new Main BFP Control Panel and new filter <br />belts. All site labor performed by Alfa Laval's personnel. <br />Chelford City WWTP Klampress (2) Size 3 2014 <br />15027 Alief Clodine Road <br />Houston, TX 77082 <br />Ramon Castillo <br />832-435-1872 <br />Scope: Complete site rebuild. Work consisted of re -galvanizing all carbon steel machine <br />components, rework roller assemblies, new stainless steel drainage pans, new fiberglass cylinders, <br />new hydraulic system, new electrical system, new stainless steel washboxes, new washtubes, new <br />gravity drainage grids, new drive gears, new filter belts and new Main BFP Control Panels. All site <br />labor performed by Alfa Laval's personnel. <br />