My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two Way Conversion of Colfax Avenue Proj No 115-053A - Rieth Riley Construction Co Inc - Financials Submitted, Not Scanned
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Two Way Conversion of Colfax Avenue Proj No 115-053A - Rieth Riley Construction Co Inc - Financials Submitted, Not Scanned
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:35:40 PM
Creation date
4/26/2018 1:54:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL KWIC <br />CITY OF SOUTH BEND <br />180 <br />Project Name Two -Way Conversion of Colfax Avenue <br />Project No. 116-063A <br />For Bids Due April 24,2018, Due at 9:30 AM Local Time <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />$129.00 <br />$2,709.00 <br />52 <br />CONSTRUCTION SIGN, A <br />21 <br />EA <br />$50.00 <br />$1,300.00 <br />53 <br />CONSTRUCTION SIGN, B <br />26 <br />EA <br />$12.00 <br />$1,728.00 <br />54 <br />BARRICADE, 111-13 <br />144 <br />LFT <br />$89.00 <br />$356.00 <br />55 <br />DETOUR ROUTE MARKERASSEMBLY <br />4 <br />EA <br />56 <br />SIGN, SHEET, SHEETING TYPE IV, WITH <br />108 <br />SFT <br />'$14.00 <br />$1,512.00 <br />LEGEND 0,080 IN. <br />57 <br />SIGN POST, SQUARE, 2, UNREINFORCED <br />216 <br />LFT <br />$10.00 <br />$2,160.00 <br />ANCHOR BASE <br />$500.00 <br />$500.00 <br />58 <br />TRAFFIC SIGNAL EQUIPMENT, REMOVE <br />1 <br />EA <br />$'7.50 <br />$78750 <br />59 <br />CONDUIT, SCHEDULE 80, PVC, 2 IN. <br />105 <br />LFT <br />$1,600.00 <br />$4,800.00 <br />60 <br />LUMINAI,RE <br />3 <br />EA <br />$1,650.00 <br />$4,950.00 <br />61 <br />LIGHT POLE <br />3 <br />r:3 <br />EA <br />$1,000.00 <br />$3,000.00 <br />62 <br />LIGHT POLE FOUNDATION, 3'x 8' <br />EA <br />63 <br />WIRE, NO. 4 COPPER, IN PLASTIC DUCT, IN <br />394 <br />LFT <br />$10.00 <br />$3,940.00 <br />TRENCH 4 I/C <br />64 <br />CABLE, POLE CIRCUIT, THWN, NO. 10 <br />180 <br />LFT <br />$1.50 <br />$270.00 <br />COPPER, STRANDED 1/C <br />65 <br />MULTIPLE COMPRESSION FITTINGS, NON- <br />8 <br />EA <br />$18.80 <br />$150.40 <br />WATERPROOF <br />$28.00 <br />$84.00 <br />66 <br />CONNECTOR KIT, UNFUSED <br />3 <br />EA <br />$24.50 <br />$73.510 <br />67 <br />CONNECTOR KIT, FUSED <br />3 <br />EA <br />$12.00 <br />$96.00 <br />68 <br />INSULATION LINK, WATERPROOFED <br />8 <br />EA <br />Bidder (Firm): Rieth-Riley Construction Co., Inc. <br />Version 10/17/2017 Contractor's Bid for Public Works - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.