Laserfiche WebLink
Project Name: Tucker Drive <br />Project No. 116-118A <br />For Bids Due: April 10th, 2018 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />$ 500.00 <br />$ 500.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />$ 6,000.00 <br />$ 6,000.00 <br />3 <br />(Clearing, Right of Way <br />1 <br />LS <br />$ 2,500.00 <br />$ 2,500.00 <br />4 <br />Pavement Removal <br />1427 <br />SYS <br />$ 5m <br />$ 7,136,00 <br />5 <br />Curb, Concrete, Remove <br />603 <br />LFT <br />$ 2.00 <br />$ 1,206.00 <br />6 <br />Excavation, Common <br />1,361 <br />CYS <br />$ 25,00 <br />34,025.00 <br />7 <br />Temporary Inlet Protection <br />5 <br />EACH <br />$ 55.00 <br />$ 275.00 <br />8 <br />Temporary Silt Fence <br />300 <br />LFT <br />$ 2.51 <br />$ 753-00 <br />9 <br />No. 2 Stone <br />171 <br />TON <br />$ 43.00 <br />$ 7,353.00 <br />10 <br />Subgradle Treatment, Type 1 <br />1962 <br />SYS <br />$ 1.00 <br />$ 1,962.00 <br />11 <br />Subgrade Treatment, Type 11 <br />547 <br />SYS <br />$ 16.00 <br />$ 8,752,00 <br />12 <br />B Borrow <br />70 <br />CYS <br />$ 25.00 <br />$ 1,750.00 <br />13 <br />Dense Graded Subbase <br />305 <br />CYS <br />$ 50.00 <br />$ 15,250.00 <br />14 <br />PCCP, 9 in. <br />1720 <br />-Sys <br />$ 60.00 <br />$ 103,200.00 <br />15 <br />ID-11 Contraction Joint <br />1164 <br />LFT <br />$ 5.50 <br />$ 6,402.00 <br />16 <br />JCurb, Integral Concrete <br />618 <br />LFT <br />$ 17.50 <br />$ 10,815.00 <br />17 <br />Curb, Turnout <br />2 <br />EACH <br />$ 1,000.00 <br />$ 2,000.00 <br />118 <br />Gutter, Concrete A <br />31 <br />70.00 <br />$ 2,170,00 <br />