My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Tucker Drive Proj No 116-118A - Rieth Riley Construction Co., Inc. - Financials Included, Not Scanned
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Tucker Drive Proj No 116-118A - Rieth Riley Construction Co., Inc. - Financials Included, Not Scanned
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:27:14 PM
Creation date
4/26/2018 9:51:09 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S BID FOR PUBLIC WORK <br />CHECKLIST FOR BIDDERS <br />Project Name Tucker Drive <br />ProjectNo. 11116-118A <br />For Bids Due April 10, 2018 at 9.30 AM Local Time <br />From time to time the South Bend Board of Public Works finds it necessary to reject a bid because <br />it does not comply with statutory requirements, In preparing your bid, please use the following <br />checklist In order to make sure that your bid Is done in the proper manner. <br />Proper bid security included. The bidder has the option of providing either a Certified Check <br />X or Bid Bond. <br />Bid prepared on the City of South Bend Contractors, Bid for Public Work Form, completely <br />X executed, <br />Contractor"s Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments <br />with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and <br />X Certification of use of United States Steel Products or Foundry Products. <br />Proof of MBE/WBE Participation Goal Form [MWBE-1.0], If minimum participation goal is not <br />met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0) and MBE)WBE Contacted <br />X Form [MWBE-2,11, <br />X Acknowledge Receipt of #1 Addendum(s) Included with the bid. <br />X All required additional information is included with the bid, <br />Proposal statements and other affidavits all signed by the proper party with name either <br />X printed or typed underneath signature, <br />X This checklist submitted with the Bid, <br />This checklist Is provided for bidder's use In assuring compliance with required <br />docurnentation; however, it does not Include all specifications requirements and does not <br />relieve the bidder of the need to read and comply with the specifications. <br />Biddec Rieth-Riley Construction Co., Inc. Date: April 10, 2018 <br />By Authorized Representative: <br />Signature: <br />Print Name & Title: <br />Version 10/17/2017 Contractor's Bid for Public Works - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.