My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec E - One or More 2018 or Newer 60' Aerial Two Wheel Drive Tower Truck Complete - Nesco, LLC - #1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Spec E - One or More 2018 or Newer 60' Aerial Two Wheel Drive Tower Truck Complete - Nesco, LLC - #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:13:59 AM
Creation date
4/26/2018 9:31:31 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
G. Winch cable shall be 3/16 " di ameter and 100 feet long galvanized aircraft cable. <br />H. Load hook shall be I -ton rated with swivel capability and safety latch. <br />1. Horizontal arm of jib to manually extend up to tlu-ee (3) positions. The stroke shall be <br />25.75". <br />J. The jib shall be capable of deployment by one (1) person. <br />Miscellaneous <br />A. The master control switch with indicator lights shall be installed in truck cab. <br />B. U/L approved 2-1/2 lbs., 5:13C dry chemical fire extinguisher shall be installed in the <br />truck cab. <br />C. A holder for operator's manuals shall be provided. <br />Placard/Decal Labels, Manuals, Video, Etc. <br />A, Each control and switch shall be clearly labeled to define function and direction of <br />operation. <br />B. Two (2) safety harnesses and 72" lanyards shall be delivered with the unit. <br />C. Three (3) complete sets of operating, service, maintenance and parts manuals applicable <br />to the aerial unit, as delivered, containing detailed parts and maintenance information <br />inclusive of all optional equipment installed shall accompany the vehicle at the time of <br />delivery. <br />D. One (1) safety and operating video, covering safe use of the manufacturer's products <br />shall accompany the vehicle at the time of delivery. <br />Options <br />A. Rotation lockout shall prevent boom from rotating to side where "MH" out -and -down <br />outriggers are not fully extended horizontally. <br />B. Two (2) Sign forks shall be located on platform, one (1) on each side. <br />C. 98" X 36" X 24" aluminum treadplate cross body box located in fi-ont of bed, behind <br />cab. <br />D. Tfiree (3) 36" X 24" X 24" aluminum underbody boxes to be located under aluminum <br />bed. <br />E. Cab windshield guard and platform walkway. Provides boom rest that replaces standard <br />boom rest. <br />F Two (2) LED strobe lights, mounted on each side of turret. Includes switch in cab. <br />G. Two (2) LED work lights mounted on each side of boom. Includes switch in cab, <br />H. Two (2) Whelen Par -36 LEG work lights mounted on front edge of operator platform. <br />I. Two (2) rubber wheel chocks with holders mounted on driver side above rear axle. <br />J. Traffic cone holder with three (3) orange traffic cones mounted at rear of bed, center. <br />K. Four (4) 24" X 24" X 4" wooden outrigger pads. Includes two (2) steel holders, <br />mounted on each side at rear of bed. <br />L. Radio remotes with hardwire backup platform. To be provided in lieu of standard upper <br />control box in platform. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.