My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(2) Ignition Park PUD
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2011
>
01-14-11 Packet
>
6B(2) Ignition Park PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2011 2:48:15 PM
Creation date
1/11/2011 2:48:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(e) Alternate Development Standards <br />In order to encourage innovative building and site designs capable of enhancing the <br />quality of the Ignition Park built environment, an applicant may propose alternate <br />development standards for: yards and building setbacks; use of minimum yards <br />and residential bufferyards; maximum building height; minimum building height; <br />maximum gross floor area; parking; loading; outdoor operations; architecture; <br />landscaping; lighting; or, signs, subject to approval by the Architectural Review <br />Board and the Area Plan Commission. <br />Application for such alternate development standards shall be in the form of a <br />Secondary Approval referred to the Area Plan Commission for determination. <br />(f) Final Site Plan Submittal Process (Secondary Approval) <br />Final Site Plan submissions or Secondary Approvals shall be filed in compliance <br />with the provision of Section 21-OS (c) (5) of the South Bend Zoning Ordinance. <br />22 <br />BDDBOI 6457864v1 As Approved by the Common Council on 12/13/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.