My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Untitled
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
09-17-10 Packet
>
Untitled
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 11:58:09 AM
Creation date
9/14/2010 3:00:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
eUUT <br />Community & Economic Development" _. <br />1200 County -City Building, 227 West Jefferson, South Bend, Indiana 46601 -1830 Phone 574/235 -9371 Fax 574/235 -9021 <br />To: Redevelopment Commission <br />From: Bill Schalliol, Economic Development Planner Dv� <br />Subject: Ignition Park streetscape improvement <br />Lafayette/Transpo sidewalk reimbursement request <br />Date: September 14, 2010 <br />As part of the site planning and coordination work with Transpo and its relocation of its headquarter <br />facility to Ignition Park, city staff was actively involved with the various design team members on the <br />site planning aspects of their project. As the Transpo project was the first main piece of <br />development to occur in the larger Ignition Park planning area, it was important that their project <br />helped to set the tone and to reinforcement design elements that would be proposed for the larger <br />development area. <br />One of the long term elements proposed to be incorporated into the Ignition Park area is a series of <br />pedestrian ways that will provide both internal and external pedestrian circulation throughout the <br />area. As the City has demolished property along Lafayette (specifically 1202 S Lafayette and in the <br />future the former Air Gas and Ziolkowski properties), new sidewalk sections have been incorporated <br />as part of the project that meet or exceed current City standards. Along the west side of Lafayette, <br />it is proposed that an 8' wide pedestrian section will be built from Indiana Avenue to Sample Street. <br />At present, Transpo has completed its portion of the expanded walkway section and it is anticipated <br />that the section will be extended later this year with demolitions at the Ziolkowski site. <br />The reason for this staff report is that the City, and more specifically the Redevelopment <br />Commission, has been asked to partner in the cost difference for the improved sidewalk section <br />along the Transpo site. City standard requires the construction of 4' sidewalk along a newly <br />developed property. Transpo had proposed to develop a 5' section from Indiana to Stull, but at the <br />request of the City, and in an effort to help meet the new standard for Lafayette, Transpo bid and <br />installed an 8' section. The difference between the 5' section and the 8' section is $15,143.00. <br />The request for reimbursement to aid the City in creating a new city standard along this corridor is <br />VERY reasonable at the $15,143.00 amount. If Transpo had installed a 5' segment, and the City <br />had wanted to later come back and install the wider segment, the cost would be much higher and <br />would have caused major site disruption to Transpo. <br />Staff requests favorable approval of this request to reimburse Transpo for their additional expense <br />of $15,143.00 for expanded sidewalks along their property. <br />What We Do Today Makes A Difference! <br />
The URL can be used to link to this page
Your browser does not support the video tag.