Laserfiche WebLink
10. Preparation of an Engineer's Report. <br />11. Wetland delineations or determinations. <br />12. Holding and /or preparation of presentation material for a public meeting. <br />13. Preparation of Final Construction Plans. <br />14. Providing Bidding Services. <br />15. Preparation of Environmental Document. <br />16. Utility Coordination. <br />17. Permitting. <br />18. Securing Right of Entry or Condemnation of parcels. <br />19. Retaining Wall Design. <br />20. Signal Design. <br />21. Construction Phase Services. <br />(The remainder of this page intentionally left blank) <br />2of2 <br />Appendix "E" <br />