Laserfiche WebLink
2) Complete bid documents for excavation; publish bid request documents in local <br />publication(s); select contractor; prepare final contract documents; award contract — <br />month 1; <br />3) Implementation /completion of excavation /remediation activities — month 2; <br />4) Submit soil remediation completion report — month 3. <br />3.6 Additional Proiect Documents <br />3.6.1 Quality Assurance Project Plan <br />A Site - specific QAPP has been prepared by Hull pursuant to the City's RLF. The QAPP <br />was prepared by Hull & Associates, Inc. (SB1031.200.0004) for the US EPA Region 5 <br />Hazardous Substances and Petroleum Brownfields Assessment Grants, submitted in <br />March 2006, approved on May 30, 2006, and later amended on April 23, 2009. <br />3.6.2 Site Health and Safety Plan <br />A Site - specific Health and Safety Plan (HASP) will be prepared prior to the <br />commencement of soil excavation activities. The HASP will provide for the safety of on- <br />Site workers involved in performing corrective actions at the Site in accordance with the <br />hazards that have been identified at the Site. The HASP will include details covering the <br />chemical and physical hazards at the Site, precautions and procedures to be followed in <br />conducting the work, and directions to medical care facilities in the event of emergency <br />or accident. The HASP will be prepared in accordance with the requirements set forth in <br />29 CFR 1910.120 and 1910.126. <br />HULL & ASSOCIATES, INC. SBI059.400.0004 <br />INDIANAPOLIS, INDIANA 8 MAY 2010 <br />