My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A(5) Resolution No. 2671
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
04-23-10 Packet
>
6A(5) Resolution No. 2671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 10:53:47 AM
Creation date
4/20/2010 4:09:23 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B <br />South Bend Memorial Hospital Bartlett Street Parking Structure <br />Facade Renovation <br />Carl Walker Scope of Services <br />B. Bidding Phase <br />1. Schedule, chair, and document the pre-bid conference for potential bidders. <br />2. Consult with the City during the bidding phase, answer questions and prepare <br />addenda as required. <br />3. Notify qualified contractors for bidding. We understand that the City will coordinate <br />the distribution of the bid packages to bidders. <br />4. Respond to contactors' questions, and if necessary issue project addenda. <br />5. Evaluate Contractor bids, and provide our comments and recommendations for the <br />award of the contract. <br />C. Construction Administration Phase <br />1. Attend pre-construction meeting to review specifications and design requirements with <br />the contractors. It is anticipated that this meeting will be held in conjunction with a <br />scheduled project progress meeting. <br />2. Provide ongoing consultation with the City and selected contractor throughout the <br />construction phase. <br />3. Review contractor pay requests, and assist in documentation of construction quantities <br />where unit pricing is used. <br />4. Process and review shop drawings. <br />5. Attend regularly scheduled progress meetings to coordinate work and to maintain <br />project communication. <br />6. Prepare bulletins and change orders as necessary to clarify and document <br />discrepancies. <br />7. Conduct construction observation visits in conjunction with progress meetings, <br />providing a periodic review of construction with respect to general conformance to <br />the contract documents. We will assist in observing and recording the work progress <br />and verify that, in general, the work complies with the intent of the plans and <br />specifications. Afield report will be prepared for each site visit. <br />8. Prepare, distribute, and update punch list for construction contract. <br />9. Make final inspection with the City, MHSB, and contractor. <br />M:\Mktg-2010\N1-10-113 South Bend Memorial Bartlett Street Facade\Exhibit B Scope of Services 03-30-10.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.