Laserfiche WebLink
42U T <br />sue sdav Mav 97 .b 1924 <br />Fisher Street pavement, continued. <br />Bird of Bryant Smelser Constr. Co. <br />Veadersburg 3 inch Vertical Fibre Btick per sq. yd. <br />on 6 inch gravel base with sand fIller per sq. yd, <br />Same with asphalt _filler <br />8 inch conduit pipe per lin ft. <br />Storm water inlets, each <br />Marginal curb per lin ft <br />Resetting inlets, each <br />Resetting manhole covers, each <br />Cheek U52.00 <br />Bich of Northern Constr. Co. <br />02.65 <br />2,80 <br />1.00 <br />15.00 <br />.40 <br />3.00 <br />3,00 <br />Grading per on. yd. <br />1.00 <br />Vaedersburg .;� inch vitrified brick per sq. yd, <br />on six inch gravel base sand filler <br />2.60 <br />• 6 inch gravel .base asphalt filler per s d. <br />q% y <br />2,75 <br />• 6 inch concrete base asphalt filler per sq. yd. <br />3.55 <br />8 inch conduit pipe per tin ft. • <br />*90 <br />• Storm water inlets, each <br />12.50 <br />Marginal curb per lin-ft. <br />.40 <br />Resetting inlets, each <br />3.®00 <br />• Resetting manhole covers, each <br />3.0 <br />Cheek $452.00' <br />Pavement on McPherson Street from the north line of <br />Dunham Street <br />to Sample Street. <br />Bid of Reich Riley Constr. Co. ` <br />' Walk per sq. ft, - <br />$.20 <br />Curb per lin ft. <br />.60 <br />- Grafting per cu. yd. > <br />• Trinidad asphalt per s d. <br />1.. 96 <br />Mexican asphalt per sq. yd. <br />25 <br />s inch Veedersburg Brick on gravel baso per sq.-yd. <br />2.65 <br />> 3 inch "" " on "" "" per sq. yd. <br />2.80 <br />Concrete pavement, per, sq. yd. <br />2.40 <br />> Trinidad Asiihaltie concrete per sq. yd. <br />2.65 <br />> Mexican asphaltic concrete per sq. yd. <br />2.45 <br />. 8 inch conduit pipe per lin ft, <br />1.00 <br />Storm water inlets, each <br />15.00 <br />Resetting inlets, each <br />3,00 <br />Resetting manhole covers, each <br />3.09 <br />Marginal curb per ,in ft. <br />.40 <br />Cheek $144.00 <br />Bid of Piummbr Constr. Co. <br />Curb per tin ft. <br />.50 <br />Grading per cu. yd. <br />1.00 <br />3 inch Veedersburg Vertical Fibre Wire Cuty <br />Gravel base sand filler per sq. yd. <br />2.55 <br />• For asphalt filler add. per sq. yd. <br />.15 <br />Concrete pavement per sq. yd, <br />2.25 <br />8 inch conduit pipe per tin ft. <br />.90 <br />Storr water inlets, each <br />12.50 <br />Marginal cgrb per lin ft. <br />.35 <br />Resetting inlets, each <br />3.00 <br />Resetting manhole covers, each <br />3.00 <br />Cheek $192.00 <br />Bid of Hoban & Roach. <br />Walk per sq. ft. <br />.20 <br />Curb per lin ft. <br />.45 <br />Grading per et. yd. <br />.95. <br />7 inch cX ix'conCrete pavement per sq. yd. <br />?_ .30 <br />8 inch enduit pipe per lin ft, <br />' <br />Storm wager inlets, each <br />9;p <br />9.00 <br />Resetting inlets, each <br />• Resetting manhole covers, each <br />3.00 <br />Check $144.00 <br />