My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/1924 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1924
>
01/23/1924 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:49:16 AM
Creation date
3/22/2018 1:14:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
1/23/1924
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
53 <br />GUARANTEE.BOND <br />MW A" 090 1-1 In" Mount thAt, <br />go lof@sJoi are hold and Firmly bound to the.City of South Bend,, Indiana$, In the <br />190 ....................... DOLLAR& <br />@ p&ym@jjt of whighl well and truly to be made, they bind themselve,sq, <br />egicutorl, administrators and assigns by these., presentast, <br />The GRAMM Of the, above obligation are. such that, whereas the above Uound <br />tat is i I I I's $I .............................. e 0 —04" <br />bas camlated tU bark Wer the contract for the construction ................... <br />Syr-rV - VIV, 0 a 4 0 8 9 0 0 a a 0 0 0 6 0•0 0 0 a 0•............ ............ <br />. . . . . . . . . . . . . . . . . I ... . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . .. . . . *I*: oleo* <br />. . . . . . . . . . . . . . . . . . . . . . .• . <br />........... . d by the Board of Public <br />under Improvement <br />. ............. ....- <br />Works of said City or ............ . ...and whereaa'ns 1-dp-and all materials <br />contractor, prin .Pal he. r�� �_aj�c4j-jtee period 6peoif ied he will <br />used in the work and agree 1 <br />hich may become necessary by reason of <br />at his own expense make rel,)&irs w <br />improper workmanship or defective materials. Suchmaint6d-Aamceg however, <br />ghall not include any damage to the pavement or to the foundation thereof or to <br />W of the, other items of work embraced by this contract resulting from any <br />lea or ciroumstancea beyona the control of the contractor,, nor is it <br />i4tnded that the contractor shall become a guarantor of the -plans and specifi.- <br />6,6tions furnished by the city. <br />IA case such repairs becc-me necessary the city shall give written notice to <br />the contractor to.make the ;;are, and in case of failure of the contractor to <br />commence suchrepairswd; -:-h-in -_hirt.v (30) days after s,--ach notice is received., <br />* !` - '_ogees e or by independest <br />the city may make ;E�!�A� h r e e r by its own em.- s <br />contract, and may thcre,_--oon r-ve_r from the ccntio.ct:;r and his--suroties the <br />reasonable cost of the. reps ir-s -nade, together v; t,.-jo cost of the super* <br />vision and inspection thereof city shall Piave --ix-tCy (60) days after the <br />expiration of said guarantee period in which to notify the contractor Of any <br />such repairs necessary on the date of such expirati--2,. Whenever (in case of <br />pavement) the repairs necessary to be made at the expiration of the guarante-d <br />period shall amount to more than fifty per cent. (50%) of the surface of <br />block, the entire pavement of that block shall be taken up and relai&�W-. <br />.accordance With the original specifications. <br />Nowif the above bound ................................... <br />...................... ....... <br />shall for a period of ............ yews from dam; -nf�17itain such.. <br />.......... <br />. . . . . . . . . . . . . . . . . . . ... . . . . . . <br />and during such time make all by the foregoing guaMt" <br />that may be necessary from any ing or disintegration of_ MAM - <br />ia18. or which are made necessary br- an-'i= Pection in workmansJ&tp#4a*-06-11 <br />:y' p e <br />strictly observe and abide by sections ............... to ........... C <br />of the General -Specifications, hereto attached and adopted by the Boardof <br />Public Works of said City and shall fulfill all the conditions and stipulations <br />relative to maintainance, therein contained, this obligation shall be void, <br />otherwise to remain in full force and effect. <br />-,The;Vkihc'ital; 0A sureties herein, each for themselves hereby represent that <br />theyhavq eAaMin4J_'t`he'plans and specifications furnished by said City for said <br />-imptiovement, -and: they .1 each hereby waive any and all claims that they now or <br />-hereafter may have th.at aa"Y-"paire necessary during the guarantee period are <br />due tol-efects or insufficient requi rer-entS in said plans or specifications, <br />anything in said contract Ior -kie foregaing guarantee to the contrary notwith- <br />standing. <br />Withess our hand and seals day of ................ <br />PRINCIPAL <br />SURETY WWVr- ""'qV97 <br />M <br />7777777777 <br />OURETY <br />7=11777 I$URETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.