My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Completion Affidavit - WWTP Compressor Building Roof Replacement Proj No 116-052 - Dudeck Roofing and Sheet Metal
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Project Completion Affidavit
>
Project Completion Affidavit - WWTP Compressor Building Roof Replacement Proj No 116-052 - Dudeck Roofing and Sheet Metal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 10:22:42 AM
Creation date
3/14/2018 10:42:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TERTIM MALI 191A 1-101 ki I <br />KNOW ALL MEN BY THESE PRESENTS: <br />That Dudeck Roofina & Sheet Metal. Inc- 1634 So <br />Bond No. MNT2156813 <br />as Principal, hereinafter call Contractor, and old Republic Insurance Company <br />Brookfield, W1, as Surety, hereinafter call Surety, are held and firmly bound: unto <br />City of South. Bend Board of Public Works as Obliges, hereinafter called Owner, in the penal sum of <br />$25,160.00 -- , for the payment whereof Contractor and Surety bind themselves, their heirs,, executors, <br />administrators, successors, and assigns, jointly and severally, firmly by these presents. <br />WHEREAS, Contractor has by written agreement, dated September 15, 2017 <br />entered into a contract with Owner for Wastewater Treatment Plant Compressor Building Roof Replacement I <br />in accordance with the General Conditions, the Drawings and Specifications, which contract is by reference incorporated herein, <br />and made a part hereof, and is referred to as the Contract. <br />NOW, THEREFORE, the condition of this obligation is such that, if Contractor shall remedy any defects due to faulty materials or <br />workmanship, and pay for any damage to other work resulting therefrom, which shall appear within a period of _three 43)_year(s) <br />from the date of substantial completion of the work provided for in the Contract, then this obligation to be void; otherwise to <br />remain in full force and effect. <br />Bond shall be effective from September 15, 2017 to September 15, 2020. <br />PROVIDED, HOWEVER, that Owner shall give Contractor and Surety notice of observed defects with reasonable promptness. <br />SIGNED and sealed this 26th day of Februaa 2018 <br />Dudeck Roofing & Sheet Metal, Inc. <br />Principal <br />B (Seat) <br />Title <br />Old Republic Insurance Company <br />By - <br />-(Seat) <br />-riti f 4 r L KaszAa Attoey in Fact <br />L/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.