Laserfiche WebLink
ALTERNATE A <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />A-1 <br />Milling, Asphalt, 1.5 in.. <br />1,615 <br />SYS <br />$6.60 <br />$10,659.00 <br />A-2 <br />Subgrade Treatment Type 1 <br />388 <br />SYS <br />$4.35 <br />$1,687.80 <br />A-3 <br />HMA Surface <br />173 <br />TON <br />$90.00 <br />$15,570.00 <br />A-4 <br />HMA Patching, Type C <br />364 <br />TON <br />$98.00 <br />$35,672.00 <br />A-5 <br />Joint Adhesive, Surface <br />1,190 <br />LFT <br />$0,10 <br />$119.00 <br />A-6 <br />Grooving for Pavement Markings <br />800 <br />LFT <br />$1.99 <br />$1,592.00 <br />A-7 <br />Line, Thermoplastic, Broken, White, 4-in. <br />60 <br />LFT <br />$2.25 <br />$135.00 <br />A-8 <br />Line, Thermoplastic, Solid, White, 4-in. <br />290 <br />LFT <br />$2.25 <br />$652.50 <br />A-9 <br />Line, Thermoplastic, Solid, Yellow, 4-in. <br />450 <br />LFT <br />$2.26 <br />$1,012.60 <br />A-10 <br />Pavement Message Marking, Thermoplastic, Lane <br />1 <br />EACH <br />$250.001 <br />$250.00 <br />ALTERNATE A TOTAL: <br />Bidder (Firm): Walsh & Kelly, Inc. <br />ALTERNATE B <br />$67,349.80 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />B-1 <br />Pavement Removal <br />560 <br />SYS <br />$6.80 <br />$3,808.00 <br />B-2 <br />Curb and Gutter, Remove <br />160 <br />LFT <br />$5,00 <br />$800.00 <br />B-3 <br />Subgrade Treatment Type 1 <br />560 <br />SYS <br />$2.35 <br />$1.316.00 <br />B-4 <br />Subgrade Treatment Type II <br />35 <br />SYS <br />$30.00 <br />$1,050.00 <br />B-5 <br />Subbase for PCCP <br />144 <br />CYS <br />$66.00 <br />$9,504.00 <br />B-6 <br />PCCP, 10-in. <br />560 <br />SYS <br />$63.60 <br />$35,616.00 <br />B-7 <br />D-1 Contraction Joint <br />336 <br />LFT <br />$19.00 <br />$6,384.00 <br />B-8 <br />Curb, Integral, Concrete <br />160 <br />LFT <br />$30.50 <br />$4,880.00 <br />B-9 <br />PCCP for Approaches, 9-in. <br />35 <br />SYS <br />$67.20 <br />$2,352.00 <br />B-10 <br />Underdrains <br />160 <br />LFT <br />$3&70 <br />$6,192.00 <br />B-11 <br />Pipe, 12-in. <br />139 <br />LFT <br />$34,00 <br />$4,726.00 <br />B-12 <br />Manhole, C-4 <br />1 <br />EACH <br />$3,000.00 <br />$3,000.00 <br />B-13 <br />Inlet, B-15 <br />2 <br />EACH <br />$3,150.00 <br />$6,300.00 <br />ALTERNATE B TOTAL: $85,928.00 <br />NOTE: Bidder shall provide Bids for the Base Bid and all Alternates provided. <br />BID SUMMARY: <br />BASE BID TOTAL $1,285,422.20 <br />ALTERNATE"A"TOTAL $67,349.80 <br />ALTERNATE "B" TOTAL $85,928.00 <br />SUBMITTED TOTAL $1,438,700.00 <br />By signature below, Bidder acknowledges receipt of Addendum No. 1 and agrees to abide by the <br />Terms and Conditions included within: <br />Bidder (Firm): Walsh & Kelly. Inc.Q��A�a <br />Address: 24358 SR 23®'`��,•°9,•oe•••• <br />City/StatelZip: South Bend, IN 46614 Telephone Number: 574 288-4811 ;' �}RPORr1]FRog� <br />Lynn, J. Bauer, South Bend Operations Manager By �J ' <br />(Printed ]Name of Person Signing) (Signature) ��� ••'^•d,,tppeo,•° ` �� <br />