'«'V 14A
<br />Pa
<br />IN65
<br />BIIDIPROPOSAIL CITY OF SOUTH BEND
<br />Project Name Ironwood Drive Pavement Rehabilitation and Intersection Project No. 117-071A
<br />For Bids Due February 27, 2018
<br />Item
<br />I
<br />Description
<br />Construction Engineering
<br />Quantity
<br />I
<br />Unit
<br />LSUM,
<br />Unit Price
<br />$6,403,35
<br />Total Amount
<br />$6,403.35
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />$64,200.00
<br />$64,200.00
<br />3
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />$5,675.00
<br />$5,675,00
<br />4
<br />Pavement Removal
<br />4,215
<br />SYS
<br />$6.80
<br />$28,662.00
<br />5
<br />Curb and Gutter, Remove
<br />985
<br />LFT
<br />$5,.00
<br />$4,925.00
<br />6
<br />Sidewalk, Concrete, Remove
<br />457
<br />SYS
<br />$9,00
<br />$4,113.00
<br />7
<br />Pipe, Remove Existing Storm Sewer
<br />856
<br />LFT
<br />$11.40
<br />$9,758.40
<br />8
<br />-9
<br />Structure, Remove Existing Storm Manhole
<br />Pipe, Abandon Existing Storm Sewer
<br />11
<br />1010
<br />EACH
<br />LFT
<br />$290.00
<br />$12.80
<br />$3,190.00
<br />$1,280,00
<br />10
<br />Excavation, Common
<br />1,116
<br />CYS
<br />$37,60
<br />$41,961.60
<br />11
<br />Borrow
<br />25
<br />CYS
<br />$69.00
<br />$1,725.00
<br />12
<br />Temporary Erosion and Sediment Control
<br />1
<br />LS
<br />$5,130.00
<br />$5,130.00
<br />13
<br />Temporary Drop Inlet Protection
<br />29
<br />EACH
<br />$135.00
<br />$3,915.00
<br />14
<br />Temporary Silt Fence
<br />732
<br />LFT
<br />$1.00
<br />$732.00
<br />15
<br />Subgrade Treatment, Type 1
<br />4,495
<br />SYS
<br />$2.35
<br />$10,563.25
<br />16
<br />Subgrade Treatment, Type 11
<br />125
<br />SYS
<br />$30.00
<br />$3,750,00
<br />17
<br />Subbase for PCCP
<br />1,116
<br />CYS
<br />$66.00
<br />$73,656.00
<br />18
<br />HMA Patching, Type C
<br />663
<br />TON
<br />$135.00
<br />$89,,505.00
<br />19
<br />Milling, Asphalt, Transition
<br />355
<br />SYS
<br />$2.35
<br />$834.25
<br />20
<br />21
<br />Milling, Asphalt, 1.5 in.
<br />H';MA Surface
<br />11,060
<br />909
<br />SYS
<br />TON
<br />$2.35
<br />$78,50
<br />$25,991.00
<br />$77,636,50
<br />22
<br />HMA Wedge and Level
<br />100
<br />TON
<br />$95.00
<br />$9,500.00
<br />23
<br />24
<br />25
<br />Joint Adhesive, Surface
<br />Asphalt for Tack Coat
<br />PCCP, 10-in.
<br />6,320
<br />3,6
<br />4,254
<br />LFT
<br />TON
<br />Sys
<br />$10.10
<br />$6,35.00
<br />$61%
<br />$632.100
<br />$2,222,50
<br />$270,554,40
<br />26
<br />D-1 Contraction Joint
<br />2,050
<br />LFT
<br />$19.00l
<br />0
<br />$38,950.00
<br />IBidder (Firm): Walsh & Kefly, Inc.
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />27
<br />Retrofitted Tie Bars
<br />30
<br />EACH
<br />$25.00
<br />$750.00
<br />28
<br />SNewalk, Concrete, 4-in.
<br />496
<br />SYS
<br />$35.60
<br />$17,657.60
<br />29
<br />Sidewalk, Concrete, 6-in,
<br />17
<br />SYS
<br />$61.80
<br />$1,050.60
<br />30
<br />31
<br />32
<br />Curb Ramp, Concrete, 6-in.
<br />Detectalble Warning Surface
<br />Curb, Integral, Concrete
<br />115
<br />13
<br />839
<br />SYS
<br />SYS
<br />LFT
<br />$112.00
<br />$160.00
<br />$30-60
<br />$12,880.00
<br />$2,080,00
<br />$25,589.50
<br />33
<br />PCCP for Approaches, 9-in.
<br />58
<br />Sys
<br />$67.20
<br />$3,897.60
<br />34
<br />H MA for Approaches, Type C
<br />18
<br />TON
<br />$146,00
<br />$2,628.00
<br />35
<br />Nursery Sodding
<br />76
<br />SYS
<br />$52.00
<br />$3,952.00
<br />36
<br />37
<br />Underdrains
<br />Pipe, 6-in,
<br />1,005
<br />8
<br />LFT
<br />LFT
<br />$38.70
<br />$75.00
<br />$38,893.50
<br />$600,00
<br />38
<br />Pipe, 12-in.
<br />444
<br />LFT
<br />$34.00
<br />$15,096.00
<br />39
<br />Pipe, 15-in.
<br />314
<br />LFT
<br />$27.00
<br />$8,478.00
<br />40
<br />Pipe, 18-in.
<br />154
<br />LFT
<br />$31.00
<br />$4,774.00
<br />41
<br />Connect to ExWing Pipe or Structure
<br />7
<br />(EACH
<br />$1,140.00
<br />$7,980,00
<br />42
<br />Manhole, C-4
<br />6
<br />EACH
<br />$3,000,00
<br />$18,000.00
<br />43 IManhole,
<br />L-4
<br />1
<br />EACH
<br />$11,300.010
<br />$11,300,00