Laserfiche WebLink
'«'V 14A <br />Pa <br />IN65 <br />BIIDIPROPOSAIL CITY OF SOUTH BEND <br />Project Name Ironwood Drive Pavement Rehabilitation and Intersection Project No. 117-071A <br />For Bids Due February 27, 2018 <br />Item <br />I <br />Description <br />Construction Engineering <br />Quantity <br />I <br />Unit <br />LSUM, <br />Unit Price <br />$6,403,35 <br />Total Amount <br />$6,403.35 <br />2 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />$64,200.00 <br />$64,200.00 <br />3 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />$5,675.00 <br />$5,675,00 <br />4 <br />Pavement Removal <br />4,215 <br />SYS <br />$6.80 <br />$28,662.00 <br />5 <br />Curb and Gutter, Remove <br />985 <br />LFT <br />$5,.00 <br />$4,925.00 <br />6 <br />Sidewalk, Concrete, Remove <br />457 <br />SYS <br />$9,00 <br />$4,113.00 <br />7 <br />Pipe, Remove Existing Storm Sewer <br />856 <br />LFT <br />$11.40 <br />$9,758.40 <br />8 <br />-9 <br />Structure, Remove Existing Storm Manhole <br />Pipe, Abandon Existing Storm Sewer <br />11 <br />1010 <br />EACH <br />LFT <br />$290.00 <br />$12.80 <br />$3,190.00 <br />$1,280,00 <br />10 <br />Excavation, Common <br />1,116 <br />CYS <br />$37,60 <br />$41,961.60 <br />11 <br />Borrow <br />25 <br />CYS <br />$69.00 <br />$1,725.00 <br />12 <br />Temporary Erosion and Sediment Control <br />1 <br />LS <br />$5,130.00 <br />$5,130.00 <br />13 <br />Temporary Drop Inlet Protection <br />29 <br />EACH <br />$135.00 <br />$3,915.00 <br />14 <br />Temporary Silt Fence <br />732 <br />LFT <br />$1.00 <br />$732.00 <br />15 <br />Subgrade Treatment, Type 1 <br />4,495 <br />SYS <br />$2.35 <br />$10,563.25 <br />16 <br />Subgrade Treatment, Type 11 <br />125 <br />SYS <br />$30.00 <br />$3,750,00 <br />17 <br />Subbase for PCCP <br />1,116 <br />CYS <br />$66.00 <br />$73,656.00 <br />18 <br />HMA Patching, Type C <br />663 <br />TON <br />$135.00 <br />$89,,505.00 <br />19 <br />Milling, Asphalt, Transition <br />355 <br />SYS <br />$2.35 <br />$834.25 <br />20 <br />21 <br />Milling, Asphalt, 1.5 in. <br />H';MA Surface <br />11,060 <br />909 <br />SYS <br />TON <br />$2.35 <br />$78,50 <br />$25,991.00 <br />$77,636,50 <br />22 <br />HMA Wedge and Level <br />100 <br />TON <br />$95.00 <br />$9,500.00 <br />23 <br />24 <br />25 <br />Joint Adhesive, Surface <br />Asphalt for Tack Coat <br />PCCP, 10-in. <br />6,320 <br />3,6 <br />4,254 <br />LFT <br />TON <br />Sys <br />$10.10 <br />$6,35.00 <br />$61% <br />$632.100 <br />$2,222,50 <br />$270,554,40 <br />26 <br />D-1 Contraction Joint <br />2,050 <br />LFT <br />$19.00l <br />0 <br />$38,950.00 <br />IBidder (Firm): Walsh & Kefly, Inc. <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />27 <br />Retrofitted Tie Bars <br />30 <br />EACH <br />$25.00 <br />$750.00 <br />28 <br />SNewalk, Concrete, 4-in. <br />496 <br />SYS <br />$35.60 <br />$17,657.60 <br />29 <br />Sidewalk, Concrete, 6-in, <br />17 <br />SYS <br />$61.80 <br />$1,050.60 <br />30 <br />31 <br />32 <br />Curb Ramp, Concrete, 6-in. <br />Detectalble Warning Surface <br />Curb, Integral, Concrete <br />115 <br />13 <br />839 <br />SYS <br />SYS <br />LFT <br />$112.00 <br />$160.00 <br />$30-60 <br />$12,880.00 <br />$2,080,00 <br />$25,589.50 <br />33 <br />PCCP for Approaches, 9-in. <br />58 <br />Sys <br />$67.20 <br />$3,897.60 <br />34 <br />H MA for Approaches, Type C <br />18 <br />TON <br />$146,00 <br />$2,628.00 <br />35 <br />Nursery Sodding <br />76 <br />SYS <br />$52.00 <br />$3,952.00 <br />36 <br />37 <br />Underdrains <br />Pipe, 6-in, <br />1,005 <br />8 <br />LFT <br />LFT <br />$38.70 <br />$75.00 <br />$38,893.50 <br />$600,00 <br />38 <br />Pipe, 12-in. <br />444 <br />LFT <br />$34.00 <br />$15,096.00 <br />39 <br />Pipe, 15-in. <br />314 <br />LFT <br />$27.00 <br />$8,478.00 <br />40 <br />Pipe, 18-in. <br />154 <br />LFT <br />$31.00 <br />$4,774.00 <br />41 <br />Connect to ExWing Pipe or Structure <br />7 <br />(EACH <br />$1,140.00 <br />$7,980,00 <br />42 <br />Manhole, C-4 <br />6 <br />EACH <br />$3,000,00 <br />$18,000.00 <br />43 IManhole, <br />L-4 <br />1 <br />EACH <br />$11,300.010 <br />$11,300,00 <br />