Job No. 1018003
<br />Task Code: 09-2000
<br />Contact Name: Barry Stewart
<br />THE ROBERT HENRY CORPORATION
<br />P.O. Box 1407
<br />404 South Frances Street
<br />South Bend, Indiana 46624
<br />SUBCONTRACT
<br />THIS AGREEMENT entered into this 10 day of November by and between The Robert Henry Corporation, an
<br />Indiana corporation, hereinafter called "Contractor", and C&S Drywall Inc 50783 Cobus Ride Lane Gran er
<br />Indiana 46507, incorporated in the State of Indiana, hereinafter called "Subcontractor".
<br />WHEREAS, the Contractor has heretofore entered into a contract with Ivy Tech Community Coke a of
<br />Indiana South Bend Campus, 220 Dean Johnson Blvd., South Bend Indiana. (the "Owner"), to furnish certain
<br />labor and materials and perform the following described work: General Construction, for the following described
<br />project: Roof Repair at the Stairs hereinafter called "Project", in strict accordance with the plans, specifications and
<br />contract documents, which plans and specifications for said Project were prepared by the Project Architect, N/A; and
<br />the Supplemental General Conditions revised August 2004, which are attached hereto, and made a part hereof.
<br />WHEREAS, Contractor and Subcontractor desire to contract with reference to a part of said work.
<br />WITNESSETH, in consideration of the mutual undertakings and other terms, covenants, conditions and
<br />agreements hereinafter contained, Contractor and Subcontractor agree as follows:
<br />1. provisions of General Contract Referenced. Hereby made a part of this Subcontract Agreement by
<br />reference thereto are the plans, specifications and Contract Documents, including general conditions, special
<br />conditions, supplementary conditions, amendments to conditions, schedules and drawings, and the agreements
<br />between Owner and Contractor for base building and tenant finish, and all provisions of said agreements between the
<br />Contractor and Owner, together with all regulations, rulings, specifications now in effect or which may be adopted
<br />applicable or pertaining to said work required in said agreements between Contractor and Owner, all of which are
<br />hereinafter referred to collectively as the "General Contract", and Subcontractor shall be bound thereby in the
<br />performance of this Subcontract and agrees to comply therewith and perform said work in accordance therewith.
<br />2. Assurnotion of Duties. Subcontractor, without limiting other obligations contained herein, assumes
<br />toward Contractor all of the obligations, duties and responsibilities that Contractor assumes in the General Contract.
<br />Subcontractor shall be bound to the same extent that Contractor is bound by each and every covenant, obligation and
<br />provision of the General Contract insofar as the same are applicable to the work of the Subcontractor hereunder, and
<br />Contractor shall have the rights and privileges as against Subcontractor as may exist against Contractor in the General
<br />Contract, unless specifically provided otherwise by this Subcontract.
<br />3. Site and Contract Examination. Subcontractor represents that he has examined sufficiently to his
<br />satisfaction the site of the work and is fully familiar with the aforesaid General Contract between Owner and Contractor,
<br />and Subcontractor agrees to perform his work in accordance with the terms and conditions set forth thereini and
<br />Subcontractor assumes full responsibility for all conditions of work known and unknown.
<br />4. Scone of Work. Subcontractor shall furnish all labor, materials, equipment and supervision, and perform
<br />all work necessary to complete the following part or parts of the work of the General Contract in all respects as is
<br />therein required of the Contractor, and all work incidental thereto, in strict accordance with plans, specifications and
<br />the contract documents, namely:
<br />furnish and install complete the GYPSUM BOARD TAPING, FINISHING AND PAINTING work as required at the bulkhead
<br />above the stairs in the west stair tower. The scope of work includes but is not limited to: all applicable permits, licenses
<br />and fees for this work only; Drywall bulkhead as designated BY THRC. The scope of work includes but is not limited to: all
<br />applicable permits, licenses and fees for this work only; supervision; coordination with other trades; temporary protection
<br />of existing finishes as needed for the Gypsum Board Taping and Finishing work; Not included are general demolition;
<br />dumpsters. C&S. Drywall will clean up on a daily basis any trash and debris which is generated as a result of their work
<br />and place it in dumpsters provided by The Robert Henry Corporation.
<br />Task Code: 09-1000; Project Completion Date: February 23, 2018.
<br />Revised February 2013