Laserfiche WebLink
Job No. 1018003 <br />Task Code: 09-2000 <br />Contact Name: Barry Stewart <br />THE ROBERT HENRY CORPORATION <br />P.O. Box 1407 <br />404 South Frances Street <br />South Bend, Indiana 46624 <br />SUBCONTRACT <br />THIS AGREEMENT entered into this 10 day of November by and between The Robert Henry Corporation, an <br />Indiana corporation, hereinafter called "Contractor", and C&S Drywall Inc 50783 Cobus Ride Lane Gran er <br />Indiana 46507, incorporated in the State of Indiana, hereinafter called "Subcontractor". <br />WHEREAS, the Contractor has heretofore entered into a contract with Ivy Tech Community Coke a of <br />Indiana South Bend Campus, 220 Dean Johnson Blvd., South Bend Indiana. (the "Owner"), to furnish certain <br />labor and materials and perform the following described work: General Construction, for the following described <br />project: Roof Repair at the Stairs hereinafter called "Project", in strict accordance with the plans, specifications and <br />contract documents, which plans and specifications for said Project were prepared by the Project Architect, N/A; and <br />the Supplemental General Conditions revised August 2004, which are attached hereto, and made a part hereof. <br />WHEREAS, Contractor and Subcontractor desire to contract with reference to a part of said work. <br />WITNESSETH, in consideration of the mutual undertakings and other terms, covenants, conditions and <br />agreements hereinafter contained, Contractor and Subcontractor agree as follows: <br />1. provisions of General Contract Referenced. Hereby made a part of this Subcontract Agreement by <br />reference thereto are the plans, specifications and Contract Documents, including general conditions, special <br />conditions, supplementary conditions, amendments to conditions, schedules and drawings, and the agreements <br />between Owner and Contractor for base building and tenant finish, and all provisions of said agreements between the <br />Contractor and Owner, together with all regulations, rulings, specifications now in effect or which may be adopted <br />applicable or pertaining to said work required in said agreements between Contractor and Owner, all of which are <br />hereinafter referred to collectively as the "General Contract", and Subcontractor shall be bound thereby in the <br />performance of this Subcontract and agrees to comply therewith and perform said work in accordance therewith. <br />2. Assurnotion of Duties. Subcontractor, without limiting other obligations contained herein, assumes <br />toward Contractor all of the obligations, duties and responsibilities that Contractor assumes in the General Contract. <br />Subcontractor shall be bound to the same extent that Contractor is bound by each and every covenant, obligation and <br />provision of the General Contract insofar as the same are applicable to the work of the Subcontractor hereunder, and <br />Contractor shall have the rights and privileges as against Subcontractor as may exist against Contractor in the General <br />Contract, unless specifically provided otherwise by this Subcontract. <br />3. Site and Contract Examination. Subcontractor represents that he has examined sufficiently to his <br />satisfaction the site of the work and is fully familiar with the aforesaid General Contract between Owner and Contractor, <br />and Subcontractor agrees to perform his work in accordance with the terms and conditions set forth thereini and <br />Subcontractor assumes full responsibility for all conditions of work known and unknown. <br />4. Scone of Work. Subcontractor shall furnish all labor, materials, equipment and supervision, and perform <br />all work necessary to complete the following part or parts of the work of the General Contract in all respects as is <br />therein required of the Contractor, and all work incidental thereto, in strict accordance with plans, specifications and <br />the contract documents, namely: <br />furnish and install complete the GYPSUM BOARD TAPING, FINISHING AND PAINTING work as required at the bulkhead <br />above the stairs in the west stair tower. The scope of work includes but is not limited to: all applicable permits, licenses <br />and fees for this work only; Drywall bulkhead as designated BY THRC. The scope of work includes but is not limited to: all <br />applicable permits, licenses and fees for this work only; supervision; coordination with other trades; temporary protection <br />of existing finishes as needed for the Gypsum Board Taping and Finishing work; Not included are general demolition; <br />dumpsters. C&S. Drywall will clean up on a daily basis any trash and debris which is generated as a result of their work <br />and place it in dumpsters provided by The Robert Henry Corporation. <br />Task Code: 09-1000; Project Completion Date: February 23, 2018. <br />Revised February 2013 <br />