Laserfiche WebLink
Jones Petrie Rafinski <br />Attention: Ed Kowalczyk <br />GIBSON-LEWIS, LLC CONTRACTORS <br />1001 West 11th Street, Mishawaka IN 46544 <br />Phone (574) 259-8581 Fax (574) 258-0932 <br />CHANGE PROPOSAL - REVISED <br />Date: 1 /30/2018 <br />Job: Charles Black Center Renovation <br />Location: South Bend, IN <br />Phone Change Proposal - New Wood Floor at Existing Gym <br />Fax <br />Gibson -Lewis, LLC Is pleased to offer the following Change Proposal for your review: <br />w Wood Floor at UlslingG - Remove existing wood floor in existing gym, and install a new wood floor to <br />match the floor which will be Installed in the new gym addition. Price includes a credit for not protecting the existing <br />wood floor. <br />Quantit <br />Unit <br />Cost Per Unit <br />Total <br />Carpenter Foreman <br />HRS <br />$ 55.49 <br />$ - <br />Carpenter Journeyman - Delete Floor Protection <br />(48.00) <br />HRS <br />$ 53.43 <br />$ (2,564.64) <br />Carpenter I <br />HRS <br />$ 55.49 <br />$ Y <br />.Foreman <br />Carpenter Journeyman - Remove Existing Wood Floc <br />272.00 <br />HRS <br />$ 53.43 <br />$ 14,532.96 <br />$ - <br />Subtotal tabor <br />$ 11,968.32 <br />Overhead & Profit Labor <br />15.00%1 <br />1 $ 1,795.25 <br />Total Labor <br />$ 13,763.57 <br />Material Quantity Unit Cost Per Unit <br />Total <br />Delete Floor Protection (1,00) LS $ 1,362,00 <br />$ (1,362.00) <br />Dumpsters 3.00 EA $ 300.00 <br />$ 900.00 <br />Sales Tax <br />N/A <br />Subtotal Material <br />$ 462.00 <br />Overhead & Profit Material 15.00% <br />$ 69.30 <br />Total Materials <br />$ 531.30 <br />Subcontractors_!!!!1 <br />Quantity <br />Unit <br />Cost Per Unil <br />Total <br />Foster - Credit for Original Gym Addition Floor Work <br />1.00 <br />LS <br />$ (55,000,00) <br />$ (55,000.00) <br />Foster - New Wood Floor Throughout (See Attached) <br />1.00 <br />LS <br />$ 129,850.00 <br />$ 129,850.00 <br />Foster - 7/16" OSB & Third and Better Maple (See A <br />1.00 <br />LS <br />$ (20,000-00) <br />$ (20,000.00) <br />LMC - Remove & Reinstall Bleachersi <br />1.00 <br />LS <br />$ 2,600.00 <br />$ 2,600.00 <br />Martell - Disconnect & Reconnect Bleachers <br />1.00 <br />L5 <br />1 $ 162.00 <br />1 <br />$ 162.00 <br />Subtotal Subcontractors <br />$ 57,512.00 <br />Overhead & Profit Subcontractors <br />5.00% <br />$ 2 876,60. <br />Total Subcontractors <br />1 $ 60,387.60 <br />Subtotal (Overaill <br />$ 73,620.00 <br />Bond <br />1.00% <br />$ 737.00 <br />$ 369.00 <br />General LiabilityInsurance <br />0.50°1° <br />Grand Total ADO <br />74 726.00 <br />Brian Palmer <br />Project Manager <br />