My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quotation - Palais Royale Awnings - Custom Awning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Award Quotations/Proposals
>
Award Quotation - Palais Royale Awnings - Custom Awning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 12:57:45 PM
Creation date
2/14/2018 1:36:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S <br />c� Cop <br />Custom Awning of South Bend <br />1251 Third Street <br />Osceola, Indiana 46561 <br />574-674-59ao <br />C�Gio," <br />i <br />October 12, 20I <br />Uw + 5 1qA. av, <br />H & H Construction <br />Fort Wayne, Indiana <br />r,,to b I L4 9 `? z) <br />L� <br />St 6 <br />C 4)) 4-o <br />Proposal Chalet Parry Shoppe 2501 South Nappanee Street !o , �� et Elkhaxt,indiana S <br />Recondition 4 Storefront Awnings - Detach and Transport to FaJfor <br />for disposal- Prepare frames — Fit replacement covers to frame for �nishjng�Rehvtern awnin csnvas <br />Reinstallg <br />3 @ 195" wide x 24" projection x 35" drop x 6" loose valance <br />1 @ 160" wide x 24" projection x 35" drop x 6" loose valance <br />Materials <br />Canvas - Sunbrella (or comparable) woven acrylic - standard color <br />Miscellaneous weather resistant hardware and fittings <br />Price $ 2960 <br />Terms <br />50% Deposit -Balance upon completion <br />Price subject to review after 30 days <br />Customer supplied graphic files <br />Custom Awning is not responsible for concealed damages or coedit <br />Custom Awning will provide insurance certificates upon request <br />Costs and fees associated with obtaining permits and other special <br />rate of$50/hour plus cost of Permits at final billing <br />Any legal or professional fees resulting from collection proceedings <br />Project completion estimated at 4-5 weeks <br />Custom Awning <br />Douglas Beals A-c <br />H & H Construction <br />Date <br />I It <br />beyond our control <br />variances, or appeals at the <br />be at customer expense <br />
The URL can be used to link to this page
Your browser does not support the video tag.