accordance with this Section 4.2 shall entitle the Architect to compensation pursuant to Section 11.3 and an
<br />appropriate adjustment in the Architect's schedule,
<br />§ 4.21 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner
<br />with reasonable promptness and explain the facts and circumstances giving rise to the need. The Architect shall not
<br />proceed to provide the following Additional Services until the Architect receives the Owners written authorization:
<br />I Services necessitated by a change in the Initial Information, previous instructions or approvals given
<br />by the Owner, or a material change in the Project including size, quality, complexity, the Owner's
<br />schedule or budget for Cost of the Work, or procurement or delivery method;
<br />.2 Services necessitated by the enactment or revision of codes, laws, or regulations, including changing or
<br />editing previously prepared Instruments of Service;
<br />3 Changing or editing previously prepared Instruments of Service necessitated by official interpretations
<br />of applicable codes, laws or regulations that are either (a) contrary to specific interpretations by the
<br />applicable authorities having jurisdiction made prior to the issuance of the building permit, or (b)
<br />contrary to requirements of the Instruments of Service when those Instruments of Service were
<br />prepared in accordance with the applicable standard of care;
<br />A Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of
<br />performance on the part of the Owner or the Owner's consultants or contractors;
<br />.5 Preparing digital models or other design documentation for transmission to the Owner's consultants
<br />and contractors, or to other Owner -authorized recipients;
<br />.6 Preparation of design and docurnentation for alternate bid or proposal requests proposed by the Owner;
<br />.7 Preparation for, and attendance at, a public presentation, meeting or hearing;
<br />,8 Preparation for, and attendance at, a dispute resolution proceeding or legal proceeding, except where
<br />the Architect is party thereto;
<br />.9 Evaluation of the qualifications of entities providing bids Or proposals;
<br />A Consultation concerning replacement of Work resulting from fire or other cause during construction;
<br />or,
<br />I I Assistance to tile Initial Decision Maker, if other than the Architect.
<br />§ 4.2.2 To avoid delay in the Construction Phase, the Architect shall provide the following Additional Set -vices,
<br />notify the Owner with reasonable promptness, and explain the facts and circumstances giving rise to the need. If,
<br />upon receipt of the Architect's notice, the Owner determines that all or parts of the services are not required, the
<br />Owner shall give prompt written notice to the Architect of the Owner's determination, The Owner shall compensate
<br />the Architect for the services provided prior to the Architect's receipt of the Owner's notice.
<br />I Reviewing a Contractor's submittal Out Of sequence from the submittal schedule approved by the
<br />Architect;
<br />,2 Responding to the Contractor's requests for information that are not prepared in accordance with the
<br />Contract Documents or where such information is available to the Contractor from a careful study
<br />and comparison of the Conti -act Documents, field conditions, other Owner -provided information,
<br />Contractor -prepared coordination drawings, or prior Project correspondence or documentation;
<br />.3 Preparing Change Orders and Construction Change Directives that require evaluation of Conti -actor's
<br />proposals and Supporting data, or the preparation or revision of Instruments of Service;
<br />A Evaluating all extensive number of Claims as the Initial Decision Maker; or,
<br />.5 Evaluating substitutions proposed by the Owner or Contractor and making subsequent revisions to
<br />Instruments of Set -vice resulting therefrom.
<br />§ 4.2.3 The Architect shall provide Construction Phase Services exceeding the limits set forth below as Additional
<br />Services. When the limits below are reached, the Architect shall notify the Owner:
<br />I I ( one ) reviews of each Shop Drawing, Product Data itern, sample and sirnilar submittals of the
<br />Contractor
<br />.2 3 ( three ) visits to the site by the Architect during construction
<br />3 1 ( one ) inspections for any portion of the Work to determine whether such portion of the Work is
<br />substantially complete in accordance with the requirements of the Contract Documents
<br />A 1 ( one ) inspections for any portion of the Work to determine final completion,
<br />§ 4.2.4, Except for services required under Section 3.6.6.5 and those services that do not exceed the limits set forth in
<br />Section 4.2.3, Construction Phase Services provided more than 60 days after (1) the date Of Substantial Completion
<br />AIA Document B101 "' — 2017. Copyright 0 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institlute of Architects. All rights reserved. VVARNiM
<br />Init. IMs MA III Documeut tls protected by U S. Copy6ght Lame and IlnterriaflwW Treaties. iUnautrnoHzed repiroducHan o,r dMOMMon of 00s AIA' Document, 14
<br />oiii any Vperofflona of K, may, restiiilt hi sevve chd1f and ctn4lm peinalUqs, and WHI bin prosecuted t�o the rnaxBirnuny exNnt pass[We undep the law, This
<br />document was produced by AIA software at 12:50:45 on 01116/2018 under Order No. 2731703659 which expires on 01/16/2019, and is not for resale.
<br />User Notes: (389ADA1C)
<br />
|