Tuesday, June I7th. , 1930.
<br />322 cu yds of grading
<br />830 sq yds of pavement C
<br />4 storm water in -lets, round
<br />200 Lin ft of 8 inch pipe C
<br />TOTAL ESTIVIIATED CONS'll"RUCTION COST
<br />Chemical inspection
<br />TOTAL ESTIMATED COST
<br />1.25
<br />402.50
<br />3.00
<br />2V490.00
<br />15.00
<br />60.00
<br />1.10
<br />220.00
<br />31402.00.
<br />24.90
<br />39426.90
<br />YGINEER' S ESTIMk E FOR WALNt7T, DIVISION
<br />11ID HURON
<br />STREETS
<br />!I
<br />IN CONNECTION "r2TH TFIA� CK ELEVATION.
<br />!'
<br />7400
<br />Sq yds temporary macadam pavement
<br />a
<br />I.50
<br />II1100.I5
<br />i
<br />36050
<br />Sq_ ft concrete walk
<br />cal
<br />.25
<br />91012.50
<br />525
<br />Lin ft standard curb
<br />C)
<br />.60
<br />3I5.00
<br />737
<br />Lin ft r rgina 1 curb
<br />a
<br />.50
<br />368.50
<br />5514
<br />Lin ft cr)mbined curb &- gutter
<br />C
<br />1.05
<br />59789.70
<br />I
<br />42195
<br />Cu yds of grading
<br />Q
<br />I.25
<br />52,743.75
<br />14059
<br />Sq yds of pavement
<br />(2,3.
<br />00
<br />42 , I77.00
<br />I7
<br />`'torm wa ter inlets rI3
<br />0
<br />20.00
<br />340.00
<br />6
<br />0-tadd.a rd storm water inlets
<br />(3
<br />15.00
<br />010.00
<br />I7
<br />4" water connections, long
<br />00
<br />38.00
<br />646.00
<br />23
<br />4" water connections,, short
<br />a
<br />28.00
<br />644/00
<br />.
<br />14
<br />I" water connection, long
<br />(n
<br />40.00
<br />560.00
<br />I
<br />14
<br />I" water c oxinecti ons, short
<br />@
<br />40.00
<br />560.00
<br />847.7
<br />cu yds of concrete to remove
<br />r
<br />5.00
<br />4)238.50
<br />1589.4
<br />Lin ft of f en ce to remove
<br />0
<br />.25
<br />397.35
<br />i)
<br />8761
<br />Sr yds of pavement to remove
<br />r
<br />I.25
<br />I0,951.25
<br />500
<br />Sq yds of 7" concrete pavement
<br />a
<br />2.50
<br />I1250.00
<br />50
<br />Sq yds of brick to relay
<br />I.40
<br />70.00
<br />735
<br />Lin Et of 24 inch pipe
<br />4.00
<br />29940.00
<br />I175
<br />Lin ft of I5 inch p ipe
<br />Cc,
<br />2.75
<br />3123I.25
<br />j
<br />409
<br />Lin ft of I2 inch pipe
<br />C
<br />2.25
<br />920.25
<br />1741
<br />Lin ft of TO inch p ipe
<br />a
<br />I.10
<br />11915.10
<br />728
<br />Lin ft of 8 inch pipe
<br />(
<br />I.10
<br />800.80
<br />2786
<br />Lin ft of 6 inch pipe
<br />C
<br />I.00
<br />29786.00
<br />409.35
<br />Cu yds e xtra c one re t e (sewer, bridge,
<br />column encasement-, curb wall)
<br />20.00
<br />8,I87.00
<br />8
<br />Manholes complete
<br />C
<br />86.50
<br />692.00
<br />2
<br />Manholes c om;)l ete
<br />C
<br />70.00
<br />140.00
<br />15
<br />MIFBM lumber
<br />(�z
<br />80.00
<br />I,200.00
<br />j
<br />1699
<br />Cu ;ids of fill
<br />C
<br />I.25
<br />21123.75
<br />600
<br />Lin ft of fence
<br />0
<br />2.50
<br />I2500.00
<br />2
<br />Combined manhole and- catch basins
<br />0
<br />50.00
<br />I00.00
<br />TOmr_L ESTIF,TATEEE CONSTEUCTION COST
<br />1671789.85
<br />advertising
<br />52.50
<br />municipal inspection
<br />I , 075.00
<br />.
<br />chemical inspection
<br />420.00
<br />TOTAL ESTIT_p_7ED COST
<br />1691337.35
<br />The Board signed the following lese with.Joseph Scheininger for a
<br />Municipal Parking Ground:
<br />L E A S E
<br />This indenture, made this I7th., d&ay of June, 1930, between Joseph
<br />Scheininger, party of the first part, and The lti.unicipal City of South Bend, by and
<br />through its }Board of Public Works, party of the second_ part, wotnesseth:
<br />Tha t the p arty of the firs t p art, for and in c onsi deration of the covan-
<br />ant s and agreements hereinafter mentioned, to be kept and performed by the party of thei!
<br />second pa rry, has demised and !_eased to the -party of the second part, the premises in
<br />the City of 6outh bend, County of bt. Joseph and State of Indiana known and described.
<br />'
<br />as follows: I
<br />Lots numbered four, five, and six in the Original -Plat of the 'Town of Lowell, now a part!
<br />of the city of "'ouch Bend, excepting therefrom a lot or parcel of land sixteen rods in
<br />length, taken off pf end From the entire width of the east end of said Lots, also Lots
<br />29 3 and 4 as shorn on the recorded plat of Ester H. Millers subdivision of a prt of
<br />Lots 4, 5 and 6 in the Original Plat of the Town of Lowell, now a part of the City of
<br />South Bend. , to be occupied as a public parking place.
<br />To have and to hold some, unto the party o f the second part from the Is t.
<br />day of August, A.D. 1930 until the 31st., day of July 1933, A. D. And the party of the
<br />,
<br />second party, in consideration of said demise, does covenant and agree with the party of
<br />the first part as follows: �
<br />First. To pay as rent for said demised premises the -sum, of 15,600.00 1I
<br />payable at the rate pf Four hundred Thirty three and 33/I00 Dollars per month, said
<br />payment to be made on the first day of July and the Ist ., day of January of each year during
<br />the life of said lease, as to any accrued and unpaid rent, provided., however, that any
<br />unpaid rent shall be due and payatale as of July Ist. , I933. Party of the second pert I
<br />is hereby given an option to lease said premises for a period of five years from the
<br />said. 31st. , day of July, 1933, at and f or an annual rental of Six Thousand Dollard
<br />
|