My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - FLIR Traffic Cameras Proj No 117-122 - Martell Electric LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - FLIR Traffic Cameras Proj No 117-122 - Martell Electric LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:33:30 PM
Creation date
12/22/2017 11:15:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/19/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ITEM NO. I QTY I UNIT <br />1 1 <br />2 4 <br />1 1 <br />2 4 <br />4601 Cleveland Road <br />South Bend, IN 46628 <br />PHONE: (574) 271-5000 <br />FAX: (574) 271-5400 <br />DESCRIPTION <br />MARTELL QUOTE No.: <br />18-1217 <br />RE:117-122 <br />FLIR TRAFFIC CAMERAS <br />DATE: 12/19/17 <br />UNIT COST TOTAL COST <br />LS <br />EA <br />DIVISION A: <br />939.00 <br />9,826.00 <br />939,00 <br />39,304,00 <br />MAINTAINING TRAFFIC <br />VEHICLE VIDEO OTECTION SYSTEM <br />DIVISION A TOTAL: <br />40,243,00 <br />LS <br />EA <br />DIVISION B: <br />939.00 <br />9,999.00 <br />939.00 <br />39,996.00 <br />MAINTAINING TRAFFIC <br />VEHICLE VIDEO DTECTION SYSTEM <br />DIVISION B TOTAL: <br />40,935.00 <br />LS <br />EA <br />DIVISION C: <br />470.00 <br />11,962.00 <br />470.00 <br />23,924.00 <br />MAINTAINING TRAFFIC <br />VEHICLE VIDEO OTECTION SYSTEM <br />DIVISION C TOTAL: <br />24,394.00 <br />NOTES: <br />1 THIS QUOTE INCLUDES ADDENDUMS 0. <br />2 THIS QUOTE DOES NOT INCLUDE ELECTRICAL <br />UTILITY CHARGES OF ANY TYPE. <br />3 THIS QUOTE 15 BASED ON STRAIGHT TIME LABOR <br />RATES UNLESS OTHERWI5E DEFINED IN <br />SPECIFICATIONS <br />4 THIS QUOTE 15 CONTINGIENT UPON MARTELL <br />ELECTRIC GETTING ADEQUATE TIME TO COMPLETE <br />OUR WORK. <br />5 THE ABOVE ITEMS ARE QUOTED AS A COMPLETE <br />PACKAGE. NO ITEM MAY BE DELETED WITHOUT <br />PRTOk APPROVA! <br />TOTAL 105,572.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.