Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Jefferson and Twyckenham Signal Improvements <br />Project No. 116-027 <br />For Blds Due July 26'", 2017 <br />BIDDER TGB Unlimited (dba) SIT Bancroft El <br />nASE BID <br />R=4tir� <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization & Demobilization <br />1 <br />LS <br />6,000.00 <br />6,000.00 <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />6,000.00 <br />6,000.00 <br />3 <br />Traffic Signal Equipment, Remove & Salvage <br />1 <br />LS <br />3,600.00 <br />3,600.00 <br />4 <br />5 <br />Signal Cantilever Structure, Drilled Shaft <br />Foundation, T e A <br />Signal Cantilever Structure, Single Arm 25 k <br />4 <br />1 <br />EA <br />EA <br />2,800.00 <br />9,500.00 <br />11,200.00 <br />9,500.00 <br />6 <br />Signal Cantilever Structure, Single Arm 30 ft. <br />3 <br />EA <br />10,000.00 <br />30,000.00 <br />7 <br />8 <br />Traffic Signal Head, 3-Section, LED <br />Traffic Signal Head, 6-Section, LED <br />6 <br />2 <br />EA <br />EA <br />650.00 <br />1,080.00 <br />3,900.00 <br />2,160.00 <br />9 <br />10 <br />Handhole, Signal, Type 1 <br />Pedestrian Push Button w1 R10-3e sign <br />4 <br />8 <br />EA <br />EA <br />800.00 <br />945.00 <br />3,200.00 <br />7,560.00 <br />11 <br />Pedestrian Signal Head with Countdown, 18- <br />inch <br />g <br />EA <br />725.00 <br />5,800.00 <br />12 <br />Conduit, HDPE, 2-inch, Schedule 80 <br />600 <br />LF <br />17.00 <br />8,500.00 <br />13 <br />Conduit, HDPE, 3-inch, Schedule 80 <br />50 <br />LF <br />25.00 <br />1,250.00 <br />14 <br />Signal Cable, Control, Copper 704GA <br />415 <br />LF <br />1.00 <br />415.00 <br />16 <br />Si nal Cable Control, Co er 5cI14GA <br />1574 <br />LF <br />1.00 <br />1,574.00 <br />17 <br />Si nal Cable, Service, Co er 3c18 <br />25 <br />LF <br />25 <br />625.00 <br />18 <br />Vehicle Video Detection System <br />4 <br />EA <br />9,500.00 <br />38,000.00 <br />19 <br />Traffic Signal Controller and Cabinet P-1 <br />1 <br />EA <br />26,000.00 <br />26,000.00 <br />20 <br />Controller Cabinet Foundation, P-1 <br />1 <br />EA <br />900.00 <br />900,00 <br />21 <br />TESCO Cabinet and Foundation <br />1 <br />EA <br />6,000.00 <br />6,000.00 <br />22 <br />Sodding <br />70 <br />SYS <br />15.00 <br />1,050.00 <br />2$ <br />Sidewalk <br />106 <br />SYS <br />76.00 <br />8,056.00 <br />24 <br />Special Concrete Curb <br />150 <br />LF <br />55.00 <br />8,250.00 <br />25 <br />HMA Pavement Patch <br />35 <br />SYS <br />165.00 <br />5,775.00 <br />26 <br />Sidewalk Curb Ram <br />36, <br />SYS <br />300.0 <br />10,800.00 <br />Version 10/17/2017 Contractors Bid for Public Works - 7 <br />