My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec AF - One or More 2017 or Newer Tandem Axle Dump Truck - Truck Centers, Inc. - dba Hill Truck Sales
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Spec AF - One or More 2017 or Newer Tandem Axle Dump Truck - Truck Centers, Inc. - dba Hill Truck Sales
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 11:44:02 AM
Creation date
12/13/2017 3:14:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prepared for: <br />Board of Public Works <br />City of South Bend IN <br />County City Bldg, <br />South Bend, IN 46601 <br />Prepared by: <br />Rich Stopozynski <br />Truck Centers, Inc. <br />1011 W. Sample St. <br />South Bend, IN 46619 <br />Phone: 574-2894065 <br />rstopczynski@truckoentersino.com <br />Description <br />HENDRICKSON HN, HAULMAAX AND UILTIMAAX <br />SERIES STEEL BEAMS WITH BAR PIN <br />FORE/AFT AND TRANSVERSE CONTROL RODS <br />REAR SHOCK ABSORBERS - TWO AXLES <br />(TANDEM) <br />1/111004#01r I <br />WABCO 4S14M ABS WITHOUT TRACTION <br />CONTROL <br />REINFORCED NYLON, FABRIC BRAID AND WIRE <br />BRAID CHASSIS AIR LINES <br />FIBER BRAID PARKING BRAKE HOSE <br />STANDARD BRAKE SYSTEM VALVES <br />STANDARD AIR SYSTEM PRESSURE <br />PROTECTION SYSTEM <br />STD, U.S. FRONT BRAKE VALVE <br />RELAY VALVE WITH 5-8 PSI CRACK PRESSURE, <br />NO REAR PROPORTIONING VALVE <br />WABCO SS-1200 PLUS AIR DRYER WITH <br />INTEGRAL AIR GOVERNOR AND HEATER <br />WABCO OIL COALESCING FILTER FOR AIR <br />DRYER <br />AIR DRYER MOUNTED OUTBOARD ON RH RAIL <br />STEEL AIR TANKS MOUNTED FOR MAX <br />GROUND CLEARANCE <br />PULL CABLE ON WET TANK, PETCOCK DRAIN <br />VALVES ON ALL OTHER AIR TANKS <br />YEMEN <br />AIR CONNECTIONS TO END OF FRAME WITH <br />GLAD HANDS FOR TRUCK AND DUST COVERS <br />PRIMARY RECEPTACLE CENTER PIN WIRED TO <br />BACKUP LIGHT CIRCUIT WITH STOP SIGNAL <br />PREWI RE PACKAGE <br />SAE J560 7-WAY PRIMARY TRAILER CABLE <br />RECEPTACLE MOUNTED END OF FRAME <br />UPGRADED CHASSIS MULTIPLEXING UNIT <br />SUPPLEMENTAL J560 7-WAY RECEPTACLE <br />LOCATED WITH PRIMARY RECEPTACLE <br />11111110/11/so <br />4800MM (189 INCH) WHEELBASE <br />7/16X3-9/16X11-1/8 INCH STEEL FRAME <br />(11.1 11MMX282.6MM/0.437Xl 1.13 INCH) 120K PSI <br />1/4 INCH (6.35MM) C-CHANNEL INNER FRAME <br />REINFORCEMENT (31,0 SECTION MODULUS <br />AND 3,715,000 RBM RATINGS) <br />SB121217A - Tandem Diesel Dump, bid Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.