My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposal - St Joe Valley Metronet, Inc. - Add Locations to the Metronet during Phase One
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Proposal - St Joe Valley Metronet, Inc. - Add Locations to the Metronet during Phase One
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:15:49 AM
Creation date
11/30/2017 10:09:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/28/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />Information Technologies Department <br />227 W Jefferson Blvd (574) 245-6000 <br />TO: Board of Public Works, Linda Martin <br />CC: Dan O'Connor <br />FROM: Michael E. Sniadecki, Director of Infrastructure <br />SUBJECT: City of South Bend -Metronet Buildout Phase 1 <br />Connecting our facilities for reliability and performance <br />DATE: 11 /02/17 <br />Linda, Jennifer, Michael & George, <br />Please see the attached quotes and spreadsheet regarding the addition of eight COSB <br />locations to the Metronet during phase one of this project. The overall initiative is to <br />connect all city facilities to the Metronet within two years. <br />Currently, Metronet serves as the backbone to share IT services/network connectivity <br />throughout many of the city facilities. Metronet provides significant savings as well as <br />better, faster, more reliable/redundant connectivity. The Office of Innovation and <br />Technology team reviewed the quote and give favorable recommendation. <br />Below are locations within phase one that have no network connection, very slow circuit, <br />and/or lack of redundancy: <br />1) Building Department <br />2) Central Fire <br />3) Fire Station #5 <br />4) Fire Station #2 <br />5) Park Maintenance <br />6) Street Department <br />7) Colfax Garage <br />8) Wayne St Garage <br />Phase one of the Metronet Buildout would be a onetime cost of $73,249. Metronet is a <br />"sole source" vendor. They are the only ones that can do this work. <br />Thank you, <br />Michael E. Sniadecki <br />
The URL can be used to link to this page
Your browser does not support the video tag.