My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec AC - One or More 2018 or Newer 3-4 Ton Extended Cab Four Wheel Drive Pick Up Truck - Jordan Ford
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Spec AC - One or More 2018 or Newer 3-4 Ton Extended Cab Four Wheel Drive Pick Up Truck - Jordan Ford
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 11:36:08 AM
Creation date
11/16/2017 10:38:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cop es, _0n0-T <br />`4 W ✓ <br />.,qCternativs <br />Tuef Systems <br />Fresno, CA * Elkhart, IN <br />Dedicated CNG - Extended Range <br />Will Gutilla 559-289-8622 1114U.n uii, <br />t�r:rtrcr �c <br />will@alaltfuels.eom?vi <br />DATE QUOTE <br />10/24/2017 <br />171024WG2 <br />NAME IADDRESS <br />Deb Starkweather <br />Jordan Automotive Group <br />Mishawaka, IN <br />P.O. NO. <br />FORD DROP SHIP <br />TERMS <br />REP <br />END USER <br />FOB <br />88MNZ4 <br />Due on Completion <br />WG <br />South Bend <br />Elkhart, IN <br />ITEM <br />DESCRIPTION <br />QTY <br />PRICE EA. <br />EPA Certified Dedicated CNG System <br />F250-W34-UB+IB <br />34 GGE 2018 Ford F-250 6.2t_ SuperCab 4x4 <br />1 <br />$16,900.00 <br />17 GGE In -Bed Slim Design plus 17 GGE Underbody <br />Per Unit <br />All Items in "Alternate 1" section of South Bend bid sent by D <br />Starkweather on 10-16-17 are included, EXCEPT: <br />• Tanks to be installed are Type 1, not Type 4. <br />• Tank system is dedicated CNG, not bi-fuel. <br />• No methane detector is provided. It is not recommended on this <br />vehicle type. <br />Note; Quote is contingent on 2018 EPA certification. <br />Note: Quote is good 60 days and is FOB Elkhart, IN. <br />Note: CNG tanks will have approximately 1000psi upon completion. <br />Note: After receipt of purchase order, vehicle will be put into production schedule. <br />Note: After parts and vehicle arrive please allow 25 working days for delivery of first vehicle, and approximately 5 <br />days for each additional vehicle. <br />Note: Vehicle must be ordered with Ford's Gaseous Fuel Prep Engine option. <br />BUYER AUTHORIZATION : Buyer's signature below is acceptance to purchase the product identified above. <br />Signature................... -....... -... -- _.............................. Date:----------------------------..---- <br />
The URL can be used to link to this page
Your browser does not support the video tag.