Laserfiche WebLink
FYI: Reminders regarding Imaginnering's draft permit: <br />1) Imagineering shall report flow daily. <br />2) Irnagineering's Authorized Representative shall sign all reports including but not limited to Periodic Compliance <br />Reports (PCR), Slug Control Plans, Flow Measurement Plans, and corrective actions in response to permit <br />violations. <br />3) Imagineering shall, within ninety (90) days of the effective date of this permit, submit an Accidental <br />Discharge/Slug Control Plan, or report as to whether the exisiting plan is still being implemented. See <br />Part III (E) (1). <br />4) Imagineering shall submit a Flow Measurement Plant (FMP) within 90 days of the issuance of this <br />permit. The IMP shall describe, at a minimum, how the permittee will meaure and record water and <br />wastewater flow in their facility. See Part III (H) (1). <br />5) When collecting composite samples, samples must be obtained over a 24 hour period or for the duration of <br />discharge within the 24 hour sampling period including, if applicable, multiple batches. <br />6) Samples shall be obtained through a flow -proportional sampling technique. If Imagineering can demonstrate <br />that time -proportional sampling is as representative as flow -proportional sampling, then a time -proportional <br />sample may be collected. If Imagineering chooses to demonstrate that time -proportional sampling is accurate <br />they must do so within 120 days of the effective date of this permit or they shall commence flow -proportional <br />sampling at that time. Please see Part II(B)(1) of your wastewater discharge permit for details. <br />7) To be submitted with the PCR, the Certified Operator shall sign one of the following statements: "Pretreatment <br />Standards and Requirements are being met on a consistent basis" or "Pretreatment Standards and Requirements <br />are not being met on a consistent basis. Additional operation and/or additional pretreatment is required to meet <br />the Pretreatment Standards and Requirements". <br />8) Only the Authorized Representative shall be required to sign the certification statement found in Part III (A)(4) of <br />this draft permit. <br />9) Section Part IV (B) (15) has been added in order to clarify the requirements concerning the Authorized <br />Representative. <br />10) For all after hours (4:00 PM) required oral notifications call: 574-277-8515 and dial zero (0) to reach an operator. <br />See Part III (I) of your permit for details. <br />Imagineering Finishing Technologies Industrial Wastewater Discharge Permit Page 2 of 25 <br />