My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to Professional Services Agreement - Lawson Fisher Associates - Ironwood Pavement Restoration
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment No. 1 to Professional Services Agreement - Lawson Fisher Associates - Ironwood Pavement Restoration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:09:11 PM
Creation date
10/25/2017 10:30:35 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 3 pages, referred <br />to in and part of the Agreement between Owner <br />and Engineer for Professional Services dated <br />July 25, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />The Effective Date of this Amendment is: October 24, 2017. <br />Background Data <br />Effective Date of Owner -Engineer Agreement: July 25, 2017 <br />Owner: Board of Public Works, City of South Bend, Indiana <br />Engineer: Lawson -Fisher Associates P.C. <br />525 West Washington Street <br />South Bend, Indiana 46601 <br />Project: Ironwood Drive Pavement Rehabilitation and Intersection. <br />Nature of Amendment: [Check those that are applicable and delete those that are inapplicable.] <br />X Additional Services to be performed by Engineer <br />Modifications to services of Engineer <br />Modifications to responsibilities of Owner <br />X Modifications of payment to Engineer <br />X Modifications to time(s) for rendering services <br />Modifications to other terms and conditions of the Agreement <br />Description of Modifications: <br />1. The design development deliverable dates were based on an anticipated grant award date <br />of August 31, 2017. This grant award was announced on September 20, 2017 for $670,000 <br />compared to the $1,000,000 sought. The Owner desires to have the Engineer reduce the <br />project construction to a lesser construction amount and continue with project <br />development as provided within Part 3 — Schedule. <br />2. Whereas, the Engineer agrees to review and revise the proposed project limits as part of the <br />Preliminary Design to the revised construction amount in consultation with the Owner. <br />3. Whereas, the Engineer will coordinate the proposed work with others for sidewalks and <br />other improvements on the west side of Ironwood Drive between Edison Road and South <br />Bend Avenue. <br />Exhibit K -- Amendment to Owner -Engineer Agreement. <br />EJCDC® E-500, Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.