Laserfiche WebLink
COST ESTIMATE <br />Geotechnical Evaluation <br />Ironwood Drive Improvements <br />South Bend, Indiana <br />EXPLORATORY FIELD ACTIVITIES <br />Mobilization and demobilization <br />1 LS <br />$300.00 1 LS <br />300.00 <br />Test boring with SPT sampling <br />87.5 ft <br />$16.00 / ft <br />1,400.00 <br />Shelby tube sampling <br />ea <br />$65.00 1 ea <br />ATV -mounted equipment <br />day <br />$300.00 1 day <br />Rock coring <br />ft <br />$32.00 / ft <br />Rock core set-ups <br />ea <br />$90.00 1 ea <br />Soundings <br />ft <br />$8.00 / ft <br />Pavement cores <br />2 ea <br />$130.00 / ea <br />260.00 <br />Road closure <br />day <br />$125.00 / day <br />Traffic control (flagmen) <br />1 day <br />$800.00 / day <br />800.00 <br />Boring layout, permits and utility coordination <br />1 LS <br />$500.00 / LS <br />500.00 <br />Per diem <br />day <br />$65.00 / day <br />Overnight living expense <br />night <br />$160.00 / night <br />Subtotal 3,260.00 <br />LABORATORY <br />Visual soil/rock classification, moisture content and <br />hand penetrometer readings <br />3 hr <br />$80.00 1 hr 240.00 <br />Atterberg limits <br />2 ea <br />$80.00 1 ea 160.00 <br />Grain size analysis <br />3 ea <br />$120.00 / ea 360.00 <br />Unconfined compression <br />ea <br />$80.00 1 ea <br />Standard Proctor <br />ea <br />$145.00 / ea <br />California bearing ratio (CBR) <br />ea <br />$400.00 / ea <br />Subtotal $760.00 <br />ENGINEERING <br />Discussion, recommendations, report of findings 1 LS $1,800.00 / LS 1,800,00 <br />Subtotal $1,800.00 <br />Estimated Total $ 5,820.00 <br />