My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Wastewater Discharge Permit - Pioneer Metal Finishing 2424 Foundation Drive
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Wastewater Discharge Permit - Pioneer Metal Finishing 2424 Foundation Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:18:34 PM
Creation date
9/26/2017 2:57:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
License Renewal
Document Date
9/26/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FYI... Below is a summary of items found in the body of Pioneer Metal Finishing's draft discharge <br />permit: <br />1) Pioneer Metal Finisling, shall report flow daily. <br />2) Pioneer Metal Finishiing's Authorized Representative shall sign all reports including, but not <br />limited to, Periodic Compliance Reports {PCR), Slug Control Plans, Flow Measurement Plans, <br />and Corrective Actions in response to permit violations. <br />3) When collecting composite samples, samples must be obtained over a 24 hour period or for the <br />duration of discharge within the 24 hour sanpling period including, if applicable, multiple <br />batches. <br />4) Samples shall be obtained through a flow -proportional sampling teclu-iique. If Pioneer Metal. <br />Finishing, can demonstrate that tirne-proportional sampling is as representative as flow - <br />proportional sampling, then a time -proportional sample may be collected. Please see Part II (B) <br />(1) of your wastewater discharge permit for details. <br />5) To be submitted with the PCR, the Certified Operator shall sigh one of the following statements <br />found on Part III (A) (3) of this draft permit: "Pretreatment Standards and Requirements aje <br />being met on a consistent basis" or "Pretreatment Standards and Requirements are not being <br />met on a consistent basis. Additional operation and/or additional pretreatment is required <br />to meet the Pretreatment Standards and Requirements". <br />6) Only the Authorized Representative shall be required to sign the certification statement found <br />in Part III (A)(4) of this permit. <br />7) Section Part IV (B) (15) has been added in order to clarify the requirements concerning the <br />Authorized Representative. <br />8) For all after hours (4:00 pin) required oral notifications call: 574-277-8515 and dial zero (0) to <br />reach an operator. See Part III (I) (2) of thus permit for details. <br />If you have any questions, feel free to contact me or Ms. Lauren Trapp at (574) 235-5852 or via <br />email at ltrapp@soulhbendin.gov <br />Sincerely� <br />Vq � <br />Manny Bueno <br />Pretreatment Coordinator <br />City of South Bend <br />Division of Environmental Services <br />3113 Riverside Drive <br />South Bend, IN 46628 <br />574-277-8515 <br />enclosures: Industrial Wastewater Discharge Drat! Permit <br />cc: file <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.