My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Charles Black Center Renovation Project No. 116-073 - Gibson-Lewis LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Charles Black Center Renovation Project No. 116-073 - Gibson-Lewis LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:54:36 AM
Creation date
9/13/2017 2:01:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Prepared by: Jones Petrie Rafinski <br />ADDENDUM NO.2 <br />To the Contract Document and Project Specifications for the <br />CHARLES BLACK CENTER <br />SOUTH BEND, INDIANA <br />PROJECT NO. 2015-0200 116-073 <br />SOUTH BEND PARKS <br />Date: Aug 21, 2017 <br />To: All holders of the contract documents for the above project. <br />The items in this addendum are to become a part of the original documents as if included therein. Only the noted items are affected and <br />the remainder of the original contract document is to remain in its entirety. <br />This Addendum modifies the Contract Documents as follows: <br />PART 1 —GENERAL CLARIFICATIONS <br />PART 2 — SPECIFICATIONS <br />PART 3 — CONSTRUCTION DRAWINGS/DETAILS <br />PART 4—PRODUCT APPROVALS <br />PART 1 — GENERAL CLARIFICATIONS <br />1. REVISE LAST date for questions to Aug 31, 2017 at 5:00 PM <br />2. REVISE Non -Mandatory site visit dates are Tuesday August 22 at 10:30 AM and Wednesday Aug 23, at 10:00 AM. <br />3. What should be done with demoed lockers in existing locker room? Return to owner <br />4. The existing weight room has equipment. Are we to relocate all that equipment? Existing exercise equipment is to be <br />removed and returned to owner. <br />5. The floor mat listed does not allow for a logo. Should we still include an allowance of $ 500.00 to add it? Yes, include <br />allowance, JPR verified a logo is possible. <br />6. There is an allowance of $ 5,000,00 for brick/block repointing, That dollar figure would be for all exterior restoration work. <br />There is a note on plan sheet A101 to clean and repair control joint in the gym. Should this cost be included in the $5,000.00 <br />or should we add money for it? Money for cleaning/repairing existing expansion joints should be separate of tuck pointing. <br />7. What manufacturer is to be used for the metal detector$? <br />CEIA HI -PE Plus 32" wide (for wheel chair) with dolly for movability. <br />8. Can existing HVAC be used during construction? No Contractor to provide temporary heat during construction per drawings <br />and specs. <br />PART 2 — SPECIFICATIONS <br />2.01 Section 129300 Site Furnishings, 2.2 6' Bench, A Basis of Design: <br />A. REVISE as follows: Subject to compliance with requirements, provide Wabash Valley, Bench. <br />1. Model No: BVIII9C <br />2. Color: <br />a. Frame: Textured Black <br />b. Horizontal Slats: Textured Black <br />3. Quantity: 9 total <br />2.02 Section 129300 Site Furnishings, 2.3 Trash Receptacles, A, Basis of Design: <br />B. REVISE as follows: Subject to compliance with requirements, provide Wabash Valley, Trash Recpetacle. <br />1. Model No: Urbanscape "J" Style — TJ31`33S <br />2. Color: Textured Black <br />3. Size: 32 Gallon <br />4. Quantity: 2 total <br />Charles Black Center Addendum #2 <br />Aug. 21, 2017 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.