My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Charles Black Center Renovation Project No. 116-073 - Gibson-Lewis LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Charles Black Center Renovation Project No. 116-073 - Gibson-Lewis LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:54:36 AM
Creation date
9/13/2017 2:01:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bidder: Gibson -Lewis, LLC <br />BID/PROPOSAL <br />w <br />CITY OF SOUTH BEND <br />Project Name Charles Black Center <br />Project No. 116.073 <br />For Bids Due September 12, 2017 <br />BASE BID <br />Item <br />No. <br />Description <br />Total Amount <br />Building remodel and addition with site work and landscaping according to <br />plans. <br />The following allowances are to be included into the Base Bid: <br />1 <br />a. Charles Black Logo in exercise room flooring = $1,000.00 <br />b. Charles Black Center Logo in entrance walkoff mat = $500.00 <br />c. Existing Brick Replacement = $5,000 <br />d. Brick Repointing = $5,000 <br />e. Gym Floor Repair - $1,000 <br />f. Contingency Allowance - $10,000 <br />BASE BID TOTAL 3 <br />F0i110ky,Fill i!IT04IT) l4Z11i»Anl <br />Item <br />No. <br />Description <br />Total Amount <br />1 <br />Soil management operations according to the prepared Soil Management Plan <br />SOIL MANAGEMENT PLAN TOTAL ( 101 L)03 <br />ALTERNATES <br />Item <br />No. <br />Description <br />Total Amount <br />1 <br />Flex Space, deduct to not construct Flex Space addition, mansard roof removal <br />shall remain in base bid. <br />ALTERNATE #1 TOTAL 6 <br />Item <br />Description <br />Total Amount <br />No. <br />Kitchen HVAC and new hood, deduct to not include new required HVAC <br />2 <br />systems for new range and not includin new range. <br />ALTERNATE #2 TOTAL u� `S , l7l►� <br />Item <br />Description <br />Total Amount <br />No. <br />Storage for Gym Room 102, deduct to not include construction of the Storage <br />3 <br />Room 102. <br />ALTERNATE #3 TOTAL 0 D X C3k)Z> <br />Version 10/17/2016 Contractor's Bid for Public Works - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.