My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Bowen Street Drainage Improvements Project No. 116-082A - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - Bowen Street Drainage Improvements Project No. 116-082A - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:29:10 PM
Creation date
8/23/2017 1:27:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State <br />Barricading <br />Inc <br />"The Road To Success Is Always Under Construction" <br />24963 US 20 West <br />South Bend, Indiana, 46628 <br />Phone: 574 287-2078 <br />Fax: 574 287-1744 <br />Quote <br />Date: 8121 /2017 <br />Job Bowen Street Drainage <br />Improvements, Project No, <br />116-082A <br />rr.>•.v>tx:t:ra� <br />Qty Item # Description Unit Price Discount <br />Maintenance Of Traffic - <br />Consists Of 2 Construction <br />Signs, A For Duration Of <br />Project (30 Calendar Days), <br />1 LS 17 Type lit Barricades, Road $875.00 Lump Sum <br />Closure Sign Assemblies & <br />Labor For Set-Up/Pick Up Of <br />Road Closure On Bowen St <br />(Approximately 6 Calendar <br />Days) <br />Drums, if Needed. (Not Shown On Plan) $0.60 Per Day, Each <br />Llne Total <br />$875.00 <br />WBE/DBE*Equal Opportunity Employers *Indiana <br />L aborars *A TSSA Certified* ISN Certified <br />Subtotal $875.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.