Laserfiche WebLink
REVISION 2 tc ++t <br />BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name Marriott Hotel Site Development at Hall of Fame, Phase 3 <br />Project No. 117-064 <br />For Bids Due August 22, 2017 <br />BASE BID PART A (MLK Streetscape) <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Construction Engineering <br />1 <br />LS <br />1, sgp, 00 <br />1, 5 oo. o o <br />2 <br />Video Record <br />1 <br />LS <br />qJ) ,00 <br />Z400. 00 <br />3 <br />Inspection Hole <br />2 <br />EACH <br />7a5, 00 <br />0R50•o0 <br />4 <br />j Mobilization and Demobilization <br />1 <br />LS <br />t.f, sue,-' 0n.00 <br />t{, S4�0•0o <br />5 <br />Clearing Right of Way <br />1 <br />LS <br />1, Stip.00 <br />), Soo• 00 <br />6 <br />Excavation, Common <br />118 <br />CYS <br />qo. oo <br />y,7ap. 00 <br />7 <br />Temporary Erosion Control <br />1 <br />LS <br />37G.'>0 <br />375. 00 <br />8 <br />Temporary Inlet Protection <br />2 <br />EACH <br />135, 0a <br />a7o. oca <br />9 <br />Compacted Aggregate, No. 53 <br />134 <br />TON <br />30. 00 <br />'40-20- 00 <br />10 <br />Sidewalk, PCCP, 5IN <br />200 <br />SYS <br />k&,00 <br />1"7,a00.0cd <br />11 <br />Brick, Decorative, Permeable <br />250 <br />SYS <br /># 30,00 <br />3 Sbo.oO <br />12 <br />PCCP for Approaches, 6 IN <br />80 <br />SYS <br />(pLt. op <br />�1.Rf7. 00 <br />13 <br />Curb Ramp, Concrete <br />46 <br />SYS <br />/00, vo <br />4(P Co.00 <br />14 <br />Standard Curb, Concrete <br />80 <br />LFT <br />to q, 00 <br />S !av• o0 <br />15 <br />Light Standard, Type A, Install <br />3 <br />EACH <br />75p, oo <br />a,aSD o a <br />16 <br />Light Standard, Type B, Install <br />1 <br />EACH <br />g00.00 <br />POO-0c, <br />17 <br />Light Pole Foundation <br />4 <br />EACH <br />(ion• 00 <br />a,gAo-00 <br />18 <br />Conduit, PVC, Schedule 80, 2 IN <br />286 <br />LFT <br />14.11'50 <br />Ira 8-T. 00 <br />19 <br />No. 4 Wire <br />315 <br />LFT <br />Sp <br />I,'j 3a.Sca <br />20 <br />Tree Grate, Install <br />5 <br />EACH <br />0.00 <br />,7Sd.00 <br />21 <br />Overstory Tree, 2 IN Caliper <br />5 <br />EACH <br />6,00 .00 <br />2000. 00 <br />22 <br />Maintaining Traffic <br />1 <br />LS <br />g00.00 <br />q00. 00 <br />BASE BID PART A BID TOTAL 9', CoQ�• so <br />HRP CONSTRUCTION INC. <br />Version 10/17/2016 Contractor's Bid for Public Works - 8 <br />