My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - JPR Corporation - Ravina Park Bowman Creek Restoration
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - JPR Corporation - Ravina Park Bowman Creek Restoration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:42:28 AM
Creation date
8/9/2017 3:12:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Furnishing services of Consultants for other than Basic Services. <br />8. Services during out-of-town travel required of Engineer other than for visits to the Site or <br />Owner's office. <br />9. Preparing for, coordinating with, participating in and responding to structured independent <br />review processes, including, but not limited to, construction management, cost estimating, <br />project peer review, value engineering, and constructability review requested by Owner; and <br />performing or furnishing services required to revise studies, reports, Drawings, <br />Specifications, or other Bidding Documents as a result of such review processes. <br />10. Preparing additional Bidding Documents or Contract Documents for alternate bids or prices <br />requested by Owner for the Work or a portion thereof. <br />11. Assistance in connection with Bid protests, rebidding, or renegotiating contracts for <br />construction, materials, equipment, or services, except when such assistance is required by <br />Exhibit F. <br />12. Preparing to serve or serving as a consultant or witness for Owner in any litigation, <br />arbitration, or other dispute resolution process related to the Project. <br />13. Providing more extensive services required to enable Engineer to issue notices or <br />certifications requested by Owner. <br />14. Assistance in connection with the adjusting of Project equipment and systems. <br />15. Assistance to Owner in training Owner's staff to operate and maintain Project equipment and <br />systems. <br />16. Overtime work requiring higher than regular rates. <br />25. Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement, <br />A2.02 Additional Services Not Requiring Owner's Written Authorization <br />B. Engineer shall advise Owner in advance that Engineer is will immediately commence to perform <br />or furnish the Additional Services of the types listed below. For such Additional Services, Engineer <br />need not request or obtain specific advance written authorization from Owner. Engineer shall cease <br />performing or furnishing such Additional Services upon receipt of written notice from Owner. <br />1. Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than "or -equal" items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.