My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - JPR Corporation - Ravina Park Bowman Creek Restoration
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - JPR Corporation - Ravina Park Bowman Creek Restoration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:42:28 AM
Creation date
8/9/2017 3:12:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. Provide information or assistance needed by Owner in the course of any negotiations with <br />prospective contractors. <br />e. Consult with Owner as to the acceptability of subcontractors, suppliers, and other individuals <br />and entities proposed by prospective contractors for those portions of the Work as to which <br />such acceptability is required by the bidding documents. <br />f. If bidding documents require, the Engineer shall evaluate and determine the acceptability of <br />"or equals" and substitute materials and equipment proposed by bidders. <br />g. Attend the Bid opening, prepare Bid tabulation sheets, and assist Owner in evaluating Bids <br />or proposals and in assembling and awarding contracts for the Work. <br />2. The Bidding or Negotiating Phase will be considered complete upon commencement of the <br />Construction Phase. <br />A1.07 Construction Services (Hourly, Not to Exceed): <br />Periodic reviews of site construction will be completed to ensure the contractor(s) is providing the <br />level of quality that is required for the project. It is anticipated that the site work will be constructed <br />in two phases. <br />The construction administration services will include: <br />1. Reviews of site construction, when requested by the City, will be completed to ensure the <br />Contractor(s) is providing the level of quality that is required for the project; <br />2. The Engineer will provide clarification/interpretations of the Contract Documents if such <br />interpretations are necessary for the proper execution or progress of work; <br />3. The Engineer shall render written recommendations on claims, disputes and other matters in <br />question between the owner and contractor relating to the execution or progress of the project <br />as provided by the Contract Documents; <br />4. Review and approve, or take other appropriate action and forward to the client for final <br />disposition, the contractor's submittals such as Shop Drawings, Product Data and Samples <br />with respect to Contract Documents produced by the Engineer; <br />S. Prepare responses to Request for Information (RFI) provided by the contractor; <br />6. Provide field reports describing observations, problems and recommended solutions; <br />7. Provide punch lists and based on site observations; <br />8. Conduct a Final Punch List site review; <br />9. Conduct inspections to determine the date or dates of Substantial Completion and the date of <br />Final Completion; <br />10. Review and approve, or take other appropriate action on, the contractor's list of items to be <br />completed or corrected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.