My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Lawson Fisher Associates - West Race Bank Trail Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
PSA - Lawson Fisher Associates - West Race Bank Trail Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 9:43:49 AM
Creation date
7/27/2017 8:54:00 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• River -edge improvements (e.g. re-establish native riparian river <br />edge, re-creation of shore line edge to avoid trash collections, etc.) <br />• "Live -Wall' components <br />• Art murals on the existing river walls <br />• Placemaking and way finding signage <br />• Additional enhancements to the river lighting strategies <br />• Design criteria and constraints <br />The first meeting will be to gather input and ideas from the group while the <br />second meeting will be used to narrow these ideas to better defined <br />alternatives. The goal of these meetings is to solicit input and to better <br />define the alternatives to progress thru to the schematic design phase. <br />3. SCHEMATIC DESIGN <br />A. LFA will perform the preliminary design for the alternatives for each project <br />area as selected during the Program Validation phase. This will include <br />trail alignments and profiles, preliminary grades of trails and major park <br />features, architectural amenities (i.e. lighting, sculptures, and key feature <br />finishes and fixtures), and preliminary structural systems. Preliminary plans <br />will be prepared for each alternative these will include: <br />• Preliminary layouts and alignments <br />• Profiles <br />• Typical sections <br />• Locations of key project and architectural features <br />• Site Analysis Plan <br />• Preliminary Site Development Plan and Details <br />• Preliminary Site Grading and Drainage Plans <br />• Site Utility Plan <br />• Conceptual Landscape Planting Plan <br />• Conceptual Placemaking and Way Finding Signage <br />• Conceptual Lighting Plans <br />• Illustrations of various details of the Schematic Design concept <br />including each of the key areas and the parks <br />Given that the alternatives will not be defined until the completion of Task <br />2 of this project, LFA assumes for this proposal that a combined total of six <br />(6) alternatives will require assessment. <br />B. LFA will conduct a meeting with the City to discuss the alternatives <br />assessed in Task 3.A. LFA will provide drawings showing general <br />geometries, profiles, typical sections, and architectural amenities of each <br />alternative to the City prior to this meeting. The goal of this meeting will be <br />to review feasibility and fine-tune each alternative for further development. <br />C. LFA will further utilize the input from the meeting in Task B to progress <br />through schematic design and develop opinions of probable cost for the <br />selected alternatives. <br />Appendix 2, Scope of Work <br />EJCDC E-520 Short form of Agreement Between Owner and Engineer for Professional Services. <br />Copyright CO2009 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.