My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Amendment No. 1 to PSA - American Structurepoint, Inc. - Additional DTSB Road Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 4:11:26 PM
Creation date
7/11/2017 2:41:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is Attachment 1, consisting of 2 pages, to Amendment <br />No. 1 <br />Modifications <br />Engineer shall perform the following Additional Services: <br />Exhibit A, Part I.A is revised by adding the following: <br />Design and plan development for the addition of an eastbound to northbound left -turn lane at the <br />intersection of Sample Street and Main Street. Design services shall include additional <br />topographic survey (Exhibit B, attached hereto and incorporated herein), road design, utility <br />coordination, traffic signal modification, project meetings with City staff and INDOT, right of way <br />engineering for two parcels, bidding phase services, and construction phase services. Right-of-way <br />engineering will include title work, title work updates, plats and legal descriptions, staking and <br />appraisal problem analysis (APAs). Review submittals will include preliminary field check plans <br />(40% complete), final plans (95% complete), and Final Tracings (100% complete). Prepare a <br />separate submittal for independent bid package of said area to be bid by Owner (Exhibit E, attached <br />hereto and incorporated herein). <br />6. Prepare a separate submittal for an independent quote package from the northwest corner of Main <br />Street and Washington Street, in front of the Chase Building, for work between back of curb and <br />face of building, including plan sheet(s), quantities, and specifications relating to construction of <br />said area. <br />7. Adjust signal timings along Martin Luther King, Main Street, and Lafayette Street between Sample <br />Street and Bartlett Street as outlined in Exhibit C, attached hereto and incorporated herein. The <br />retiming of signals shall include the following: signal system inventory assessment, analysis and <br />timing development, and deployment. <br />Exhibit A, Part 1.13 is added to read as follows: <br />B. Services Not Included in Engineer's Scope: <br />1. Hydraulics analysis and design of storm sewer <br />2. Geotechnical investigation <br />Subsurface utility engineering <br />4. Lighting design and plan development <br />5. Sanitary and water line design and plan development <br />6. Land Acquisition Services <br />2. For the Additional Services or the modifications to services set forth above, Owner shall pay <br />Engineer the following additional or modified compensation: <br />Section 7.0 ] A. I is revised as follows: <br />Page l of 2 <br />201401351 <br />
The URL can be used to link to this page
Your browser does not support the video tag.